Mervyn Lambert Plant Ltd Implements MyMobileWorkers for Enhanced Compliance and Efficiency
公司规模
Mid-size Company
地区
- Europe
国家
- United Kingdom
产品
- MyMobileWorkers
技术栈
- Real-time mobile workforce management system
实施规模
- Enterprise-wide Deployment
影响指标
- Cost Savings
- Customer Satisfaction
- Productivity Improvements
- Environmental Impact Reduction
技术
- 功能应用 - 远程监控系统
- 分析与建模 - 实时分析
- 功能应用 - 企业资源规划系统 (ERP)
适用行业
- 建筑与基础设施
- 运输
适用功能
- 现场服务
- 质量保证
- 商业运营
用例
- 预测性维护
- 车队管理
- 远程资产管理
- 实时定位系统 (RTLS)
服务
- 系统集成
- 培训
关于客户
Mervyn Lambert Plant (MLP) has been a prominent name in the Highways industry for nearly 50 years. With more than 200 employees, MLP is one of the largest companies in their sector, providing plant hire and traffic management services to both private and public sectors. Known for their high standards of work, MLP has built a reputation for quality and reliability. However, the company faced challenges with their traditional paper-based processes, which led to inefficiencies and inaccuracies in data collection and compliance management. To address these issues, MLP sought a modern solution to streamline their operations and improve overall efficiency.
挑战
For years, Mervyn Lambert Plant (MLP) used a predominantly paper process for recording their jobs, combined with a hire and accounting system in the background. The problem lay in the quality of the data they gathered from their operatives. The data was either unclear or inaccurate due to the nature of using a paper process, and with over 500 jobs per week, something needed to change. The inefficiencies and inaccuracies in data collection led to delays in identifying quality issues, often resulting in complaints from the general public or clients. Additionally, the paper-based process made it difficult to enforce compliance with health and safety laws and to manage documentation effectively.
解决方案
After evaluating various solutions, MLP decided to implement the MyMobileWorkers real-time mobile workforce management system. They chose this system due to its suitability for the traffic management sector and its ability to track jobs from start to finish. The system allowed MLP to complete checklists, risk assessments, and take photographs, providing a comprehensive front-end solution. By March 2016, MLP had completely removed their paper-based process and fully integrated MyMobileWorkers into their operations. The system enforced compliance with health and safety laws by requiring operatives to check Risk Assessments and Method Statements before starting work. All relevant documentation, including site drawings, was attached to the job and easily accessible. Issues could be highlighted via photos, drawings, or text, and were automatically flagged to MLP’s support team for review. This real-time access to information allowed for immediate resolution of non-compliance issues and improved overall job quality.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Airport SCADA Systems Improve Service Levels
Modern airports are one of the busiest environments on Earth and rely on process automation equipment to ensure service operators achieve their KPIs. Increasingly airport SCADA systems are being used to control all aspects of the operation and associated facilities. This is because unplanned system downtime can cost dearly, both in terms of reduced revenues and the associated loss of customer satisfaction due to inevitable travel inconvenience and disruption.
Case Study
IoT-based Fleet Intelligence Innovation
Speed to market is precious for DRVR, a rapidly growing start-up company. With a business model dependent on reliable mobile data, managers were spending their lives trying to negotiate data roaming deals with mobile network operators in different countries. And, even then, service quality was a constant concern.
Case Study
Digitize Railway with Deutsche Bahn
To reduce maintenance costs and delay-causing failures for Deutsche Bahn. They need manual measurements by a position measurement system based on custom-made MEMS sensor clusters, which allow autonomous and continuous monitoring with wireless data transmission and long battery. They were looking for data pre-processing solution in the sensor and machine learning algorithms in the cloud so as to detect critical wear.
Case Study
Cold Chain Transportation and Refrigerated Fleet Management System
1) Create a digital connected transportation solution to retrofit cold chain trailers with real-time tracking and controls. 2) Prevent multi-million dollar losses due to theft or spoilage. 3) Deliver a digital chain-of-custody solution for door to door load monitoring and security. 4) Provide a trusted multi-fleet solution in a single application with granular data and access controls.
Case Study
Vehicle Fleet Analytics
Organizations frequently implement a maintenance strategy for their fleets of vehicles using a combination of time and usage based maintenance schedules. While effective as a whole, time and usage based schedules do not take into account driving patterns, environmental factors, and sensors currently deployed within the vehicle measuring crank voltage, ignition voltage, and acceleration, all of which have a significant influence on the overall health of the vehicle.In a typical fleet, a large percentage of road calls are related to electrical failure, with battery failure being a common cause. Battery failures result in unmet service agreement levels and costly re-adjustment of scheduled to provide replacement vehicles. To reduce the impact of unplanned maintenance, the transportation logistics company was interested in a trial of C3 Vehicle Fleet Analytics.