实例探究 > What Lies Beneath: Condition Assessment at St. Joseph’s Health Care, London

What Lies Beneath: Condition Assessment at St. Joseph’s Health Care, London

公司规模
Large Corporate
地区
  • America
国家
  • Canada
产品
  • ARCHIBUS Condition Assessment
  • ARCHIBUS Space Management
  • ARCHIBUS Overlay for AutoCAD with Design Management
技术栈
  • AutoCAD
  • ARCHIBUS
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Customer Satisfaction
  • Productivity Improvements
技术
  • 功能应用 - 企业资产管理系统 (EAM)
  • 应用基础设施与中间件 - 数据可视化
适用行业
  • 医疗保健和医院
适用功能
  • 设施管理
用例
  • 楼宇自动化与控制
  • 建筑能源管理
  • 预测性维护
服务
  • 系统集成
  • 软件设计与工程服务
关于客户
St. Joseph’s Health Care, London, Ontario, is a major tertiary patient care, teaching, and health research corporation. It operates five major sites and 23 community-based satellites, managing approximately 3.5 million square feet of space. The hospital is currently undergoing a significant 10-year provincial health services restructuring initiative. This public hospital is known for its comprehensive healthcare services and is deeply involved in teaching and research activities. The restructuring initiative, coupled with projected funding shortfalls and decreasing capital resources, has necessitated a closer examination of the condition of its facilities to ensure continued high-quality patient care and operational efficiency.
挑战
St. Joseph’s Health Care, London, faced significant challenges due to a major 10-year provincial health services restructuring initiative, projected funding shortfalls, and decreasing capital resources. Over 50% of their long-term care portfolio had emerging issues such as an imbalance in private to semi-private room ratios, physical barriers to wheelchair accessibility, lack of meeting spaces, structural stability of window solar shades, and the condition of sanitary piping. The Marian Villa building at St. Joseph’s Mount Hope Centre for Long Term Care was particularly designated for reevaluation. The goal was to determine the immediate and long-term costs associated with maintaining the status quo versus major renovation, and to demonstrate the value of electronic capture and presentation of information using the ARCHIBUS Condition Assessment application.
解决方案
St. Joseph’s utilized the ARCHIBUS Condition Assessment application to identify the costs and efforts associated with upgrading major components of its portfolio and the risks of inaction. The department was given 90 days to complete the assessment project, which included a field review of 128,000 square feet on four residential levels and one common services level. Discipline-specific technicians performed the field reviews, and the notes were integrated into the Condition Assessment application, which worked in conjunction with the hospital’s AutoCAD drawings and existing ARCHIBUS space information. The assessments covered everything from code compliance to occupational health and safety requirements, and the condition of mechanical, electrical, and control systems. The results were forwarded to a cost consultant who estimated the capital costs associated with repair and/or replacement. The data was presented in a Condition Scoreboard and a Capital Planning Summary, which validated the assessment conclusions and provided a 20-year capital plan.
运营影响
  • The ARCHIBUS Condition Assessment application allowed for the personalization of priority values to reflect specific needs and added new fields to assist Facilities Planning in understanding the 20-year capital plan.
  • The assessment revealed that the Marian Villa building was in generally good condition and capable of being upgraded to the desired ‘A’ Standard through re-bedding of rooms and addition of air conditioning and sprinkler systems.
  • The study concluded that a major renovation to meet current design standards was not fiscally viable without additional revenue or one-time capital funding from the provincial government.
  • The Condition Assessment Scoreboard proved to be a useful tool for presenting high-level information to senior decision-makers on the long-term capital budget required.
  • The corporate-wide assessment currently underway is expected to greatly enhance knowledge of the facilities’ condition and improve the ability to plan for and advocate for additional funds required to maintain the facilities.
数量效益
  • The department completed the assessment project within 90 days.
  • Over 3,920 assessments were performed on various aspects of the building.
  • The assessment covered 128,000 square feet of space across five levels.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。