The Floating Future of Design
公司规模
SME
地区
- America
国家
- United States
产品
- Hendo Hoverboard
- Vectorworks Architect
技术栈
- Magnetic Field Architecture (MFA)
- 3D Printing
- CAD Technology
实施规模
- Pilot projects
影响指标
- Innovation Output
- Customer Satisfaction
- Environmental Impact Reduction
技术
- 分析与建模 - 数字孪生/模拟
- 应用基础设施与中间件 - 数据可视化
- 功能应用 - 远程监控系统
适用行业
- 建筑与基础设施
- 教育
- 运输
适用功能
- 设施管理
- 产品研发
用例
- 楼宇自动化与控制
- 预测性维护
- 远程资产管理
- 智慧城市运营
服务
- 硬件设计与工程服务
- 软件设计与工程服务
- 系统集成
关于客户
Arx Pax, LLC, based in Los Gatos, CA, is the parent company of Hendo Hover, makers of the Hendo Hoverboard. Founded by Greg and Jill Henderson, the company is pioneering Magnetic Field Architecture (MFA) technology. Greg Henderson, a licensed architect, uses his knowledge of structural design and CAD technology to inform his work on MFA. The company aims to use this technology to levitate various objects, including buildings, to protect them from natural disasters. Arx Pax maintains financial independence through crowdfunding, allowing them to focus on solving real-world problems.
挑战
Greg and Jill Henderson wanted to create a real hoverboard, inspired by the 'Back to the Future' movie trilogy. Despite skepticism from others, they pursued their vision using Magnetic Field Architecture (MFA) technology. Their goal was not just to create a hoverboard but to revolutionize urban planning and infrastructure by using MFA to levitate various objects, including buildings, to protect them from natural disasters like earthquakes and floods. Achieving this required significant financial resources, which they secured through a successful crowdfunding campaign.
解决方案
Arx Pax developed the Hendo Hoverboard as a proof of concept for their Magnetic Field Architecture (MFA) technology. This technology allows objects to levitate, providing a new tool for humanity to protect lives and property from natural disasters. The company envisions using MFA to lift buildings off the ground during earthquakes or floods, creating a buffer against these events. They also see potential applications in various industries, such as lifting computer servers to prevent overheating and creating hovering automobiles. The company uses Vectorworks Architect software for design and 3D printing to quickly prototype their ideas.
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Airport SCADA Systems Improve Service Levels
Modern airports are one of the busiest environments on Earth and rely on process automation equipment to ensure service operators achieve their KPIs. Increasingly airport SCADA systems are being used to control all aspects of the operation and associated facilities. This is because unplanned system downtime can cost dearly, both in terms of reduced revenues and the associated loss of customer satisfaction due to inevitable travel inconvenience and disruption.
Case Study
IoT-based Fleet Intelligence Innovation
Speed to market is precious for DRVR, a rapidly growing start-up company. With a business model dependent on reliable mobile data, managers were spending their lives trying to negotiate data roaming deals with mobile network operators in different countries. And, even then, service quality was a constant concern.
Case Study
Digitize Railway with Deutsche Bahn
To reduce maintenance costs and delay-causing failures for Deutsche Bahn. They need manual measurements by a position measurement system based on custom-made MEMS sensor clusters, which allow autonomous and continuous monitoring with wireless data transmission and long battery. They were looking for data pre-processing solution in the sensor and machine learning algorithms in the cloud so as to detect critical wear.
Case Study
Cold Chain Transportation and Refrigerated Fleet Management System
1) Create a digital connected transportation solution to retrofit cold chain trailers with real-time tracking and controls. 2) Prevent multi-million dollar losses due to theft or spoilage. 3) Deliver a digital chain-of-custody solution for door to door load monitoring and security. 4) Provide a trusted multi-fleet solution in a single application with granular data and access controls.
Case Study
Vehicle Fleet Analytics
Organizations frequently implement a maintenance strategy for their fleets of vehicles using a combination of time and usage based maintenance schedules. While effective as a whole, time and usage based schedules do not take into account driving patterns, environmental factors, and sensors currently deployed within the vehicle measuring crank voltage, ignition voltage, and acceleration, all of which have a significant influence on the overall health of the vehicle.In a typical fleet, a large percentage of road calls are related to electrical failure, with battery failure being a common cause. Battery failures result in unmet service agreement levels and costly re-adjustment of scheduled to provide replacement vehicles. To reduce the impact of unplanned maintenance, the transportation logistics company was interested in a trial of C3 Vehicle Fleet Analytics.