技术
- 分析与建模 - 大数据分析
- 分析与建模 - 预测分析
适用行业
- 石油和天然气
适用功能
- 流程制造
用例
- 机器状态监测
客户
哥伦比亚管道集团
关于客户
总部位于休斯顿的哥伦比亚管道集团 (CPG) 在 16 个州拥有 15,000 英里的州际管道。他们运营着 100 多个气站,压缩功率约为 110 万马力,每年输送约 1.3 tcf 的天然气。
挑战
CPG 发生压缩资产故障,导致服务中断,并有可能引起客户不满。
解决方案
CPG 与总部位于俄亥俄州奥罗拉的机器人公司 RoviSys Co. 合作开发实时监控系统。新的企业分析程序使用 SharePoint、PI 和 SQL 技术来分析数据并推动主动和纠正措施。其目标是避免设施关闭并最大限度地减少压缩机站的故障。
收集的数据
Downtime, Fault Detection, Gas Meters, Maintenance Requirements, Per-Unit Maintenance Costs
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.
Case Study
Remote Wellhead Monitoring
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.
Case Study
Refinery Saves Over $700,000 with Smart Wireless
One of the largest petroleum refineries in the world is equipped to refine various types of crude oil and manufacture various grades of fuel from motor gasoline to Aviation Turbine Fuel. Due to wear and tear, eight hydrogen valves in each refinery were leaking, and each cost $1800 per ton of hydrogen vented. The plant also had leakage on nearly 30 flare control hydrocarbon valves. The refinery wanted a continuous, online monitoring system that could catch leaks early, minimize hydrogen and hydrocarbon production losses, and improve safety for maintenance.
Case Study
H800L IoT Ball Valve
Ham-Let is a leading manufacturer of valves, fittings and instrumentation. One of the key challenges in this industry is identifying malfunctions and shutting off the appropriate valves before any damage can be done. However, it is often a demanding task to identify the cause of the malfunction and isolate the valves quickly.