公司规模
Large Corporate
地区
- Pacific
国家
- Australia
产品
- Ingres Database
- Ingres OpenROAD
- Ingres Icebreaker Business Intelligence (BI) Appliance
技术栈
- Ingres Database
- Ingres OpenROAD
- Jaspersoft Business Intelligence Suite
实施规模
- Enterprise-wide Deployment
影响指标
- Cost Savings
- Productivity Improvements
技术
- 应用基础设施与中间件 - 数据库管理和存储
- 分析与建模 - 大数据分析
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 食品与饮料
适用功能
- 离散制造
- 物流运输
用例
- 库存管理
- 预测性维护
- 供应链可见性(SCV)
服务
- 软件设计与工程服务
关于客户
Established in 1984, Peerless Foods has grown to become Australia’s largest producer of edible oils, fats and margarines. Peerless chose Ingres as the platform to build a custom Enterprise Resource Planning (ERP) application. In addition to being able to manage and automate every aspect of their planning, production and distribution, Peerless saved between $300,000 to $400,000 per year in licensing fees.
挑战
With its business growing, Peerless needed a more consistent, flexible platform to modernize its production environment and support future expansion. The company began exploring commercial off-the-shelf enterprise resource planning (ERP) systems and underlying databases. While companies in similar situations often go straight to proprietary vendors, Peerless decided to build its own ERP solution from the ground up. With a team of just a half-dozen developers, Hamilton’s department set out to develop a fully featured business platform that would automate every aspect of the company’s business processes – from forecasting and ordering, to production, packaging, and distribution – in order to enable a highly optimized just-in-time manufacturing process. To support this environment, Peerless required a flexible, scalable database environment that would be easy for developers to optimize around the evolving ERP platform.
解决方案
After evaluating a range of proprietary and open-source solutions, Peerless decided that Ingres Database offered the best functionality at one-sixth the price. Ingres was selected as the underlying database for its mission-critical business systems. Developers were equipped with the Ingres OpenROAD application development environment to build its ERP system. By the time the application was completed, it was clear that Ingres Database had been the best choice for the project. Hamilton estimates the company has saved between $300,000 to $400,000 a year in licensing fees by using its own code. More recently, Peerless has complemented its ERP environment with the Ingres Icebreaker Business Intelligence (BI) Appliance, a comprehensive business intelligence system that combines the Ingres database with the Jaspersoft Business Intelligence Suite. For Peerless, the result has been a comprehensive analytical suite that is being used by two dozen business managers for a range of production, forecasting, planning and sales analysis that will help the business run even more efficiently.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
The Kellogg Company
Kellogg keeps a close eye on its trade spend, analyzing large volumes of data and running complex simulations to predict which promotional activities will be the most effective. Kellogg needed to decrease the trade spend but its traditional relational database on premises could not keep up with the pace of demand.
Case Study
HEINEKEN Uses the Cloud to Reach 10.5 Million Consumers
For 2012 campaign, the Bond promotion, it planned to launch the campaign at the same time everywhere on the planet. That created unprecedented challenges for HEINEKEN—nowhere more so than in its technology operation. The primary digital content for the campaign was a 100-megabyte movie that had to play flawlessly for millions of viewers worldwide. After all, Bond never fails. No one was going to tolerate a technology failure that might bruise his brand.Previously, HEINEKEN had supported digital media at its outsourced datacenter. But that datacenter lacked the computing resources HEINEKEN needed, and building them—especially to support peak traffic that would total millions of simultaneous hits—would have been both time-consuming and expensive. Nor would it have provided the geographic reach that HEINEKEN needed to minimize latency worldwide.
Case Study
Energy Management System at Sugar Industry
The company wanted to use the information from the system to claim under the renewable energy certificate scheme. The benefit to the company under the renewable energy certificates is Rs 75 million a year. To enable the above, an end-to-end solution for load monitoring, consumption monitoring, online data monitoring, automatic meter data acquisition which can be exported to SAP and other applications is required.
Case Study
Coca Cola Swaziland Conco Case Study
Coco Cola Swaziland, South Africa would like to find a solution that would enable the following results: - Reduce energy consumption by 20% in one year. - Formulate a series of strategic initiatives that would enlist the commitment of corporate management and create employee awareness while helping meet departmental targets and investing in tools that assist with energy management. - Formulate a series of tactical initiatives that would optimize energy usage on the shop floor. These would include charging forklifts and running cold rooms only during off-peak periods, running the dust extractors only during working hours and basing lights and air-conditioning on someone’s presence. - Increase visibility into the factory and other processes. - Enable limited, non-intrusive control functions for certain processes.
Case Study
Temperature Monitoring for Restaurant Food Storage
When it came to implementing a solution, Mr. Nesbitt had an idea of what functionality that he wanted. Although not mandated by Health Canada, Mr. Nesbitt wanted to ensure quality control issues met the highest possible standards as part of his commitment to top-of-class food services. This wish list included an easy-to use temperature-monitoring system that could provide a visible display of the temperatures of all of his refrigerators and freezers, including historical information so that he could review the performance of his equipment. It also had to provide alert notification (but email alerts and SMS text message alerts) to alert key staff in the event that a cooling system was exceeding pre-set warning limits.
Case Study
Coca-Cola Refreshments, U.S.
Coca-Cola Refreshments owns and manages Coca-Cola branded refrigerators in retail establishments. Legacy systems were used to locate equipment information by logging onto multiple servers which took up to 8 hours to update information on 30-40 units. The company had no overall visibility into equipment status or maintenance history.