GE Digital (GE) (General Electric) > 实例探究 > Panama Minimizes Imbalance Penalties with Power Forecasting

Panama Minimizes Imbalance Penalties with Power Forecasting

GE Digital (GE) (General Electric) Logo
公司规模
Large Corporate
地区
  • Asia
国家
  • India
产品
  • GE’s Operations Optimization
技术栈
  • Cloud hybrid architecture
实施规模
  • Pilot projects
影响指标
  • Cost Savings
  • Productivity Improvements
技术
  • 平台即服务 (PaaS) - 数据管理平台
适用行业
  • 可再生能源
适用功能
  • 离散制造
用例
  • 预测性维护
服务
  • 云规划/设计/实施服务
关于客户
The customer in this case study is Panama Group, a power generation company based in India. The company operates in the renewable energy sector, specifically in wind power generation. They were faced with the challenge of meeting regulatory requirements set by India's Renewable Regulatory Fund (RRF). These requirements necessitated accurate weather data forecasting, which was a challenge due to unreliable site connectivity. The company needed a solution that could manage turbine data availability and provide closed-loop control.
挑战
Panama Group, a power generation company based in India, was faced with the challenge of meeting India's Renewable Regulatory Fund (RRF) regulatory requirements. The company needed to determine the quality and resolution of weather data for forecast accuracy. However, they were dealing with unreliable site connectivity, which made it difficult to manage turbine data availability and gain closed-loop control. The challenge was to find a solution that could address these issues and help the company meet its regulatory requirements.
解决方案
To address the challenges faced by Panama Group, an initial pilot of GE’s Operations Optimization solution was implemented on one of their wind farms. This wind farm consisted of 44 Wind Turbine Generators (WTGs) and had a capacity of 70 MW. The solution involved the development of a new wind power forecast algorithm that was capable of predicting outcomes 1–4 hours in advance. To address the issue of network connectivity, a hybrid architecture was used that combined on-premises and cloud technologies. This solution was designed to meet the company's specific needs and help them achieve their goals.
运营影响
  • The implementation of GE’s Operations Optimization solution resulted in a successful outcome for Panama Group. The solution was provided as a service, aligning the interests of both the customer and GE. The new wind power forecast algorithm was able to achieve a forecast accuracy of 94%, which was 6% better than industry “best” benchmarks.
  • The hybrid architecture addressed the network connectivity challenges, ensuring reliable management of turbine data availability and providing closed-loop control.
  • The solution helped Panama Group meet the regulatory requirements set by India's Renewable Regulatory Fund (RRF), ensuring compliance and minimizing potential penalties.
数量效益
  • 94% forecast accuracy achieved
  • 6% better than industry “best” benchmarks
  • Lower imbalance penalties of $126K per farm realized annually

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。