实例探究 > Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

Mid-Size EPC Reduces Cost Estimating Time Up to 90% to Meet Tighter Schedules and Budgets

公司规模
200-1,000
地区
  • America
国家
  • United States
产品
  • Aspen Capital Cost Estimator
  • aspenONE suite of Process Engineering applications
技术栈
  • Process Engineering Software
  • Estimating Software
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Productivity Improvements
技术
  • 应用基础设施与中间件 - 数据交换与集成
适用行业
  • 建筑与基础设施
  • 石油和天然气
适用功能
  • 离散制造
  • 采购
用例
  • 预测性维护
  • 过程控制与优化
服务
  • 软件设计与工程服务
关于客户
S&B Engineers and Constructors Ltd. is a privately held Engineering, Procurement, and Construction (EPC) company based in Houston, Texas. The company has a strong record of quality work and excellence in project performance. However, in recent years, it has been challenged by shrinking client budgets and tighter project schedules. Clients are demanding more for less, including more detailed digital handover of data to accompany traditional project deliverables. To remain competitive, S&B needed to find a solution that was faster and more tailored to the process industries than the traditional approach of producing project estimates.
挑战
S&B Engineers and Constructors Ltd., a Houston-based EPC, has been facing challenges due to shrinking client budgets and tighter project schedules. Clients are demanding more for less, including more detailed digital handover of data to accompany traditional project deliverables. To remain competitive, S&B needed to find a solution that was faster and more tailored to the process industries than the traditional approach of producing project estimates.
解决方案
S&B turned to Aspen Capital Cost Estimator, part of the aspenONE suite of Process Engineering applications, to reduce risk to both S&B and its clients. The software provides early estimates with key supporting details to assist in defining potential cost, schedule, and resource risks, helping S&B focus on the highest cost components of the project. Despite operating with constrained estimating resources, S&B found the system easy to adopt and configure to its engineering standards. In addition, with its enhanced and intuitive functionality, the solution easily scales to meet the needs of a smaller team dedicated to the estimating function.
运营影响
  • S&B has measured a 5:1 reduction in estimating hours required to prepare FEL1 and FEL2 estimates, with approximately half that savings going toward FEL3 estimates.
  • This has enabled estimators to dedicate additional time to value-added analysis of project estimates, what-if studies, and other client deliverables.
  • S&B also takes advantage of the solution’s interface capabilities, enabling export of estimate details and resource loading into a project scheduling system.
  • Overall, the use of the aspenONE solution has helped S&B react more quickly to volatile competitive and economic conditions, and become more proactive in using the estimating function as a valuable component in the marketing of its project services.
数量效益
  • 5:1 reduction in estimating hours for FEL1 and FEL2 estimates
  • 2.5:1 reduction in estimating hours for FEL3 estimates

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。