实例探究 > Largest Singapore University Deploys BIM with ARCHIBUS to Manage Space, Assets, and Maintenance at Expansive Campus

Largest Singapore University Deploys BIM with ARCHIBUS to Manage Space, Assets, and Maintenance at Expansive Campus

公司规模
Large Corporate
地区
  • Asia
国家
  • Singapore
产品
  • ARCHIBUS
  • Revit
技术栈
  • BIM
  • 3D Scanners
  • AutoCAD
实施规模
  • Enterprise-wide Deployment
影响指标
  • Productivity Improvements
  • Digital Expertise
  • Customer Satisfaction
技术
  • 功能应用 - 远程监控系统
  • 功能应用 - 企业资产管理系统 (EAM)
  • 应用基础设施与中间件 - 数据可视化
适用行业
  • 教育
适用功能
  • 设施管理
  • 维护
用例
  • 楼宇自动化与控制
  • 建筑能源管理
  • 资产健康管理 (AHM)
服务
  • 系统集成
  • 培训
关于客户
Singapore’s Nanyang Technological University (NTU) is yet another example of Singapore’s unrelenting search for excellence in education as well as in commerce. The university placed 1st among the world’s best young universities and ranked 13th globally in the 2015 QS World University Rankings. Needless to say, its 33,000-student enrollment and extensive campus has only grown with its reputation. NTU currently comprises a 200-hectare garden campus and houses that country’s largest on-campus residence infrastructure. NTU’s extensive portfolio of planted grounds, 16 residence halls, and numerous academic buildings meant that the school finally recognized that its leading-edge academics also required the introduction of a leading-edge, BIM-based solution to address NTU’s facilities management challenges.
挑战
NTU’s extensive portfolio of planted grounds, 16 residence halls, and numerous academic buildings meant that the school finally recognized that its leading-edge academics also required the introduction of a leading-edge, BIM-based solution to address NTU’s facilities management challenges. Central to that effort was the creation of NTU BIM models integrated with ARCHIBUS facilities management data to produce both 2D and 3D visualizations of its properties for more precise, proactive space, asset, and maintenance management. NTU was the first university in Singapore to adopt BIM technology for facility operation in response to a call by the Building Construction Authority (BCA) of Singapore to use BIM for building lifecycle management. In 2013, ARCHIBUS was chosen to help meet the BIM adoption objective because of its Enterprise Information Modelling (EIM) capability. BIM-enabled space planning was then implemented in the first phase of the project to better optimize space as a first step in achieving a range of project goals. Those goals also included the elimination of manual FM processes; more efficient generation of reports and room inventories; and improved leased space chargeback processes.
解决方案
To accomplish these tasks the university had to first import its log forms, Excel spreadsheets, and CAD drawings into its BIM models. The BIM information was then integrated with its ARCHIBUS database information. This resulting system, implemented in approximately 4 months, allowed users to access both 2D and 3D views of university room or floor configurations and entire exterior building representations. All that information, in turn, will ultimately be linked to lease, maintenance, asset and other information required by the university for accounting and reporting purposes. “Everyone loves to play with the BIM models,” says Japri Maming, CEO of ARCHIBUS Solution Center – Singapore. “This was an accelerated implementation that we completed in 4 months with the help of two teams that were needed to clean up and verify data in addition to the integration work and training. For older buildings that didn’t even have CAD drawings, we used 3D scanners to generate drawings and 3D room views using Revit. Since you sometimes can’t scan behind a wall, we also had to develop formulas to account for infrastructure. Materials information that couldn’t be captured in the 3D scans – like flooring, carpeting, manufacturers, etc. – had to be entered into the model manually.” To the extent possible, NTU used ARCHIBUS out-of-the-box but a request for more customized user interfaces for laptop, desktop, and mobile users were also developed.
运营影响
  • The implementation of BIM models integrated with ARCHIBUS facilities management data allowed NTU to produce both 2D and 3D visualizations of its properties, leading to more precise and proactive space, asset, and maintenance management.
  • The university was able to eliminate manual facilities management processes, leading to more efficient generation of reports and room inventories.
  • The integration of BIM information with ARCHIBUS database information allowed users to access comprehensive views of university room or floor configurations and entire exterior building representations.
  • The project included the use of 3D scanners to generate drawings and 3D room views for older buildings that didn’t have CAD drawings, ensuring comprehensive data capture.
  • Customized user interfaces for laptop, desktop, and mobile users were developed to enhance user satisfaction and accelerate adoption.
数量效益
  • The implementation was completed in approximately 4 months.
  • NTU’s campus spans 200 hectares and includes 16 residence halls.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。