实例探究 > How Magna Used project44 to Create a Just-in-Sequence Delivery

How Magna Used project44 to Create a Just-in-Sequence Delivery

公司规模
1,000+
地区
  • Europe
产品
  • project44 Advanced Visibility Platform™
技术栈
  • Telematics
  • Real-time Visibility
  • Data Normalization
  • Automated Data Flows
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Customer Satisfaction
  • Productivity Improvements
技术
  • 分析与建模 - 实时分析
  • 功能应用 - 车队管理系统 (FMS)
适用行业
  • 汽车
适用功能
  • 物流运输
用例
  • 车队管理
  • 实时定位系统 (RTLS)
  • 供应链可见性(SCV)
服务
  • 软件设计与工程服务
  • 系统集成
关于客户
Magna is the leading brand-independent engineering and manufacturing partner for OEMs and has over 100 years of vehicle production experience. They are focused on delivering superior value to customers through innovative processes and world-class manufacturing.
挑战
Magna’s Smart Factory required just-in-sequence deliveries from a range of locations. To ensure deliveries arrived in sequence regardless of origin, Magna Steyr needed a smarter way to access over-the-road visibility in the European market.
解决方案
Supported by project44, Magna introduced the first Industry 4.0 driven Long Distance Just-in-Sequence (LD-JIS) logistics program for its Smart Factory concept. Magna chose project44’s Advanced Visibility Platform™ to collect, normalize, and enrich telematics data, then feed it to their systems. Magna’s dispatchers and controllers now have real-time visibility of all JIS supplies and can monitor planned routes and deviations of JIS trucks and trailers. Data flows are now automated, eliminating costly errors from human intervention. Magna is now ensured that loads in the supply chain will arrive on the right vehicle, in sequence, and on time.
运营影响
  • Magna has greatly increased operational efficiency.
  • The system rollout only took 4 weeks.
  • They saw a 100% increase in productivity by doubling their number of shipments without an increase in headcount or the need to order special transports.
  • They saw a 40% increase in on-time deliveries.
  • Magna experienced significant cost savings.
数量效益
  • 4 weeks to complete the system rollout.
  • 100% increase in productivity.
  • 2x shipments without an increase in headcount.
  • 40% increase in on-time deliveries.
  • 40% cost savings.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。