BASF Standort Shuttle
公司规模
1,000+
地区
- Europe
国家
- Germany
产品
- ViaVan Standort Shuttle
- Mercedes-Benz Vans
技术栈
- Transportation-as-a-Service (TaaS)
- Dynamic Shared Rides Technology
实施规模
- Enterprise-wide Deployment
影响指标
- Customer Satisfaction
- Environmental Impact Reduction
- Productivity Improvements
技术
- 功能应用 - 车队管理系统 (FMS)
- 功能应用 - 远程监控系统
适用行业
- 化学品
适用功能
- 设施管理
- 物流运输
用例
- 车队管理
- 预测性维护
- 远程资产管理
服务
- 软件设计与工程服务
- 系统集成
关于客户
BASF SE is a German multinational chemical company and the largest chemical producer in the world. The company operates more than 200 unique production facilities and employs over 39,000 people at its Ludwigshafen site, which spans 10.4 square kilometers. This site is the largest integrated chemical complex in the world, and employees, contractors, and visitors use various modes of transportation, including personal vehicles, heavy-duty lorries, automated guided vehicles (AGVs), trains, and bikes, to navigate the bustling complex. BASF is committed to sustainability and sought an innovative transportation solution to reduce single-occupancy vehicle travel, parking pressure, and enhance the overall experience for employees and visitors.
挑战
Remove the need for personal vehicles for transportation around a large industrial complex and increase traffic safety. Improve mobility for employees and visitors at BASF’s Ludwigshafen Site while reducing traffic.
解决方案
In September 2018, ViaVan launched the Standort Shuttle at BASF’s headquarters in Ludwigshafen. The shuttle service allows employees and visitors to request rides on-demand, providing fast and convenient access to all areas of the complex. The service complements BASF’s existing fixed-route bus service with a flexible system that matches multiple passengers headed in the same direction into a shared, dynamically-routed shuttle. This creates more efficient and convenient travel around the site. The Standort Shuttle operates under Via’s unique Transportation-as-a-Service (TaaS) model, providing partners with vehicles, drivers, and operations in addition to on-demand technology. ViaVan worked closely with BASF’s safety experts to design a solution that accounts for the site’s constantly shifting traffic conditions. The service is free for employees and visitors of the Ludwigshafen Site.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless
Tata was facing data accessibility challenges in the cement plant control room tapping signals from remote process control areas and other distant locations, including the gas scrubber. Tata needed a wireless solution to extend its control network securely to remote locations that would also provide seamless communication with existing control applications.
Case Study
Advanced Elastomer Systems Upgrades Production
In order to maintain its share of the international market for thermoplastic elastomers AES recently expanded its Florida plant by adding a new production line. While the existing lines were operating satisfactorily using a PROVOX distributed control system with traditional analog I/O, AES wanted advanced technology on the new line for greater economy, efficiency, and reliability. AES officials were anxious to get this line into production to meet incoming orders, but two hurricanes slowed construction.
Case Study
Wireless GPS Tracking & Security Monitoring
Enhancing the security of hazardous freight and ensuring compliance with Homeland Security’s Transportation Security Administration mandate that all trains carrying chemicals capable of creating a toxic inhalation condition are equipped with on-board safety monitoring systems.
Case Study
Field Device Asset Management For Chemical Company in China
Chinese chemical subsidiary of multinational corporation serves customers throughout the world. Sales offices and research and technology centers are strategically located to provide rapid response to customer requests. Just two workers were assigned to maintain thousands of intelligent instruments in three production units, so they could do little more than react to device issues as they appeared. This costly maintenance method inevitably led to unexpected downtime when a critical instrument failed. Plant management recognized the need to change from reactive to predictive maintenance for all assets, including instruments and control valves, but help was needed in implementing such a technology-based initiative.
Case Study
Industrial Workforce Mobility for Improved Safety & Operations
Huntsman Corporation, a global manufacturer and marketer of differentiated chemicals, undertook an aggressive program to eliminate injuries, product defects, and environmental releases at their Port Neches facility. Termed “Project Zero”, this program required a completely mobile solution to empower operations and maintenance personnel to capture defects, track work progress and make process and safety related decisions in real-time.