Accelerating automotive assembly and test system design with SolidWorks Premium
公司规模
Large Corporate
地区
- America
国家
- United States
产品
- SolidWorks Premium
- SolidWorks Professional
- SolidWorks Simulation
- SolidWorks eDrawings
- Autodesk Inventor
技术栈
- 3D CAD
- Simulation Software
- Design Optimization
实施规模
- Enterprise-wide Deployment
影响指标
- Cost Savings
- Customer Satisfaction
- Productivity Improvements
技术
- 分析与建模 - 预测分析
- 应用基础设施与中间件 - 数据可视化
- 功能应用 - 产品生命周期管理系统 (PLM)
适用行业
- 汽车
适用功能
- 产品研发
- 质量保证
服务
- 软件设计与工程服务
- 培训
关于客户
Assembly & Test Worldwide (ATW) operates five separate divisions, including its Advanced Assembly Automation (AAA) division, which specializes in developing component assembly and testing systems for the automotive industry. AAA engineers first moved to a 3D development platform in 2001 when the company transitioned from AutoCAD® 2D software to the Autodesk Inventor® 3D CAD system. After using Inventor software for more than three years, management decided to reevaluate the company’s design platform in 2004, with a particular focus on assessing large-assembly design capabilities.
挑战
AAA engineers routinely work with large assemblies of between 1,000 and 5,000 components. In 2004, the company decided to reevaluate its design platform, focusing on large-assembly design capabilities. They had previously used Autodesk Inventor but wanted to assess other options like SolidWorks, Solid Edge, and Pro/ENGINEER. The goal was to find a more intuitive and easier-to-use software that could also support assembly analysis. The company ran a benchmark project using both SolidWorks and Inventor to validate their assumptions.
解决方案
AAA decided to transition to SolidWorks software after a successful benchmark project. The company initially implemented 20 seats of SolidWorks Professional and later added more seats, including SolidWorks Premium. The transition included basic and advanced modeling as well as SolidWorks Simulation training. The move to SolidWorks provided an impetus for process improvement, standardization, and automation. AAA engineers completed all new projects using SolidWorks software, which helped in reducing design costs and rework, thereby boosting throughput. The integrated assembly analysis capabilities of SolidWorks Simulation allowed AAA to optimize designs and reduce material usage.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Integral Plant Maintenance
Mercedes-Benz and his partner GAZ chose Siemens to be its maintenance partner at a new engine plant in Yaroslavl, Russia. The new plant offers a capacity to manufacture diesel engines for the Russian market, for locally produced Sprinter Classic. In addition to engines for the local market, the Yaroslavl plant will also produce spare parts. Mercedes-Benz Russia and his partner needed a service partner in order to ensure the operation of these lines in a maintenance partnership arrangement. The challenges included coordinating the entire maintenance management operation, in particular inspections, corrective and predictive maintenance activities, and the optimizing spare parts management. Siemens developed a customized maintenance solution that includes all electronic and mechanical maintenance activities (Integral Plant Maintenance).
Case Study
Monitoring of Pressure Pumps in Automotive Industry
A large German/American producer of auto parts uses high-pressure pumps to deburr machined parts as a part of its production and quality check process. They decided to monitor these pumps to make sure they work properly and that they can see any indications leading to a potential failure before it affects their process.