Technology Category
- Networks & Connectivity - 5G
- Platform as a Service (PaaS) - Application Development Platforms
Applicable Industries
- Cement
- Construction & Infrastructure
Applicable Functions
- Maintenance
Use Cases
- Construction Management
- Construction Site Monitoring
About The Customer
Odisee University College is among the largest educational institutions in Belgium, with approximately 17,000 students. For more than 15 years, the university has been offering technical courses such as building construction, computer design, 3D and BIM to students graduating in Construction Technology. Almost 90% of these graduates end up working in the construction industry. The university is committed to ensuring that its students can easily read and make drawings, as well as interpret projects quickly, which is why they use 2D. They are also keen on introducing BIM fundamentals within one platform.
The Challenge
Odisee University College, one of the largest educational institutions in Belgium, has been teaching technical courses such as building construction, computer design, 3D and BIM to students graduating in Construction Technology for over 15 years. However, they faced challenges with their existing CAD software. The university's lecturers were not familiar with BricsCAD and had doubts about switching their student CAD licenses to this platform. They were concerned about maintaining their existing workflows and teaching the same curriculum at the same pace. Additionally, they were unhappy with the lack of connection between 2D and 3D drawings using their previous software, SketchUp and AutoCAD®, which made it difficult to introduce BIM fundamentals within one platform.
The Solution
Despite initial doubts, Odisee University College decided to switch their student CAD licenses to BricsCAD. The lecturers found that they could maintain their existing workflows and teach the same curriculum at the same pace as with AutoCAD®. The core 2D functionality of BricsCAD was identical to their previous software, allowing for a smooth transition. To address the issue of connecting 2D and 3D drawings, the university introduced BricsCAD BIM during the second semester. This allowed them to introduce BIM fundamentals within one platform, keeping the colleagues who needed the 2D materials satisfied, and introducing the students to the BIM world in a fast and consistent way. Furthermore, the university acquired over 200 BricsCAD volume licenses and 150 network licenses that float across the entire educational network, covering both students and teachers.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.