ARGOS DIRECT STRENGTHENS MULTI-CHANNEL RETAIL OPERATION with Supply Chain Solution
Customer Company Size
Large Corporate
Region
- Europe
Country
- United Kingdom
Product
- Manhattan Warehouse Management
- Psion Teklogix RF Equipment
Tech Stack
- Warehouse Management System
- Radio Frequency (RF) Equipment
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Customer Satisfaction
- Cost Savings
Technology Category
- Functional Applications - Warehouse Management Systems (WMS)
- Networks & Connectivity - RF Transceivers
Applicable Industries
- Retail
Applicable Functions
- Warehouse & Inventory Management
- Logistics & Transportation
Use Cases
- Inventory Management
- Warehouse Automation
- Supply Chain Visibility
Services
- System Integration
- Training
About The Customer
Argos Direct is the delivery-to-home operation of Home Retail Group, the UK's leading home and general merchandise retailer. With sales exceeding £4.2 billion in the last financial year, Argos is a significant player in the UK retail market. The Argos website is the second most visited retail site in the UK, and nearly two-thirds of the UK population have an Argos catalogue at home. Argos Direct operates three warehouses in the UK, serving different regions of the country. The company needed to upgrade its warehouse management system to handle increased throughput and improve operational efficiency.
The Challenge
Argos Direct, the delivery-to-home operation of Home Retail Group, faced significant challenges with its in-house warehouse management system. The system, which managed order management, order taking, forecasting, replenishment, and warehouse management, was not scalable or flexible enough to handle significant increases in throughput. This limitation became particularly evident as Argos Direct expanded its operations to include three warehouses across the UK. The first two warehouses operated on the custom-built system, but the third warehouse required an entirely new warehouse management system to cope with the increased volume and complexity of operations.
The Solution
Argos Direct selected Manhattan Associates' Warehouse Management solution for a small pilot project at its Marsh Leys warehouse. The success of this pilot led to the full implementation of the solution at the new Faverdale facility. To complement the warehouse management solution, Argos Direct also selected radio frequency (RF) equipment from Psion Teklogix. The implementation went smoothly, and Argos Direct decided to upgrade the Marsh Leys warehouse to the Manhattan solution as well. The Marsh Leys warehouse posed a larger challenge due to its size and the number of SKUs it handled. Argos Direct adopted a 'mirror' model for the implementation, running the old and new systems in parallel during the transition period. This approach ensured a smooth data migration and minimized operational disruption.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Improving Production Line Efficiency with Ethernet Micro RTU Controller
Moxa was asked to provide a connectivity solution for one of the world's leading cosmetics companies. This multinational corporation, with retail presence in 130 countries, 23 global braches, and over 66,000 employees, sought to improve the efficiency of their production process by migrating from manual monitoring to an automatic productivity monitoring system. The production line was being monitored by ABB Real-TPI, a factory information system that offers data collection and analysis to improve plant efficiency. Due to software limitations, the customer needed an OPC server and a corresponding I/O solution to collect data from additional sensor devices for the Real-TPI system. The goal is to enable the factory information system to more thoroughly collect data from every corner of the production line. This will improve its ability to measure Overall Equipment Effectiveness (OEE) and translate into increased production efficiencies. System Requirements • Instant status updates while still consuming minimal bandwidth to relieve strain on limited factory networks • Interoperable with ABB Real-TPI • Small form factor appropriate for deployment where space is scarce • Remote software management and configuration to simplify operations
Case Study
How Sirqul’s IoT Platform is Crafting Carrefour’s New In-Store Experiences
Carrefour Taiwan’s goal is to be completely digital by end of 2018. Out-dated manual methods for analysis and assumptions limited Carrefour’s ability to change the customer experience and were void of real-time decision-making capabilities. Rather than relying solely on sales data, assumptions, and disparate systems, Carrefour Taiwan’s CEO led an initiative to find a connected IoT solution that could give the team the ability to make real-time changes and more informed decisions. Prior to implementing, Carrefour struggled to address their conversion rates and did not have the proper insights into the customer decision-making process nor how to make an immediate impact without losing customer confidence.
Case Study
Digital Retail Security Solutions
Sennco wanted to help its retail customers increase sales and profits by developing an innovative alarm system as opposed to conventional connected alarms that are permanently tethered to display products. These traditional security systems were cumbersome and intrusive to the customer shopping experience. Additionally, they provided no useful data or analytics.
Case Study
Ensures Cold Milk in Your Supermarket
As of 2014, AK-Centralen has over 1,500 Danish supermarkets equipped, and utilizes 16 operators, and is open 24 hours a day, 365 days a year. AK-Centralen needed the ability to monitor the cooling alarms from around the country, 24 hours a day, 365 days a year. Each and every time the door to a milk cooler or a freezer does not close properly, an alarm goes off on a computer screen in a control building in southwestern Odense. This type of alarm will go off approximately 140,000 times per year, equating to roughly 400 alarms in a 24-hour period. Should an alarm go off, then there is only a limited amount of time to act before dairy products or frozen pizza must be disposed of, and this type of waste can quickly start to cost a supermarket a great deal of money.
Case Study
Supermarket Energy Savings
The client had previously deployed a one-meter-per-store monitoring program. Given the manner in which energy consumption changes with external temperature, hour of the day, day of week and month of year, a single meter solution lacked the ability to detect the difference between a true problem and a changing store environment. Most importantly, a single meter solution could never identify root cause of energy consumption changes. This approach never reduced the number of truck-rolls or man-hours required to find and resolve issues.