Bluebeam Software > 实例探究 > The Walsh Group Boosts Civil Jobsite Mobility with Revu for iPad

The Walsh Group Boosts Civil Jobsite Mobility with Revu for iPad

Bluebeam Software Logo
公司规模
1,000+
地区
  • America
国家
  • United States
产品
  • Bluebeam Revu for iPad
  • Bluebeam Studio
技术栈
  • Document Management
  • Digital Dashboards
  • Hyperlinked Document Sets
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Productivity Improvements
技术
  • 功能应用 - 远程监控系统
适用行业
  • 建筑与基础设施
用例
  • 施工现场监控
  • 远程协作
服务
  • 软件设计与工程服务
关于客户
The Walsh Group is a Chicago-based general contractor that was awarded the opportunity to lead the construction of a federally funded, $76 million expansion of the northbound I-75 highway near Hartsfield-Jackson International Airport in Atlanta, Georgia. The project aimed to improve traffic flow in one of the area's most congested corridors. The expansion included a variety of components, such as the construction of a tunnel bridge, cast-in-place, cut and MSE walls, utility relocations, and asphalt and concrete paving. The project's complexity required firm coordination between various team members, including managers and engineers in the office and project managers, engineers, superintendents, and subcontractors on the jobsite.
挑战
In 2019, The Walsh Group, a general contractor, began a $76 million expansion of the northbound I-75 highway near Hartsfield-Jackson International Airport in Atlanta, Georgia. The project aimed to alleviate congestion in one of the area's most traffic-heavy corridors. The expansion included the construction of a tunnel bridge, cast-in-place, cut and MSE walls, utility relocations, and asphalt and concrete paving. The project's complexity required firm coordination between managers and engineers in the office and project managers, engineers, superintendents, and subcontractors on the jobsite. Traditionally, a steady flow of paper plan documents would migrate between office and field workers, with field workers navigating the site in trucks filled with paper. However, The Walsh Group sought to streamline this process and mitigate risk through digital solutions.
解决方案
The Walsh Group implemented a suite of Bluebeam technology solutions, including Revu for iPad, to streamline document management and various workflows. The use of Revu for iPad allowed project leaders to bolster complex document management workflows while superintendents and engineers were spread out across different parts of the jobsite's seven-mile expanse. Instead of transporting large paper drawings to the field, the team pushed out and viewed documents on tablets with the Revu application. The team also utilized hyperlinked document sets, allowing field workers to easily find and access details as they implemented elements on the jobsite. Additionally, the team used digital dashboards created using Revu, serving as a hyperlinked project information hub where all users could quickly and easily access critical project documents and other important resources.
运营影响
  • The use of tablets in the field reduced the risk of incorrect information being transmitted between workers in the office and those on the jobsite.
  • The improved organization and clarity that Revu for iPad brought to the project made field workers more productive as they could navigate a large civil jobsite without having to carry around unorganized rolls of paper plans.
  • The use of hyperlinked document sets and digital dashboards streamlined more efficient productivity and communication between workers in the field and in the office.
数量效益
  • By using tablets in the field, The Walsh Group estimates it has been able to save between roughly $10,000 to $15,000 from reduced printing costs.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。