GE Digital (GE) (General Electric) > 实例探究 > Power On Demand — Fast and Efficient

Power On Demand — Fast and Efficient

GE Digital (GE) (General Electric) Logo
公司规模
1,000+
地区
  • America
国家
  • United States
产品
  • OpFlex Fast Start software
技术栈
  • Software Modification
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Environmental Impact Reduction
技术
  • 应用基础设施与中间件 - API 集成与管理
适用行业
  • 公用事业
适用功能
  • 维护
用例
  • 能源管理系统
服务
  • 软件设计与工程服务
关于客户
Platte River Power Authority is a not-for-profit wholesale electricity generation and transmission provider based in Colorado. The company's Rawhide Energy Station has a capacity of 668 MW and consists of a primary coal-fired unit with four GE 7EA gas turbines as peaking and backup units. The company also uses additional power sources such as coal, hydro, and wind. Platte River Power Authority is committed to maintaining strict emissions controls while also hedging against short-term market pricing fluctuations.
挑战
Platte River Power Authority, a not-for-profit wholesale electricity generation and transmission provider in Colorado, faced a challenge. The company's 668 MW Rawhide Energy Station consists of a primary coal-fired unit with four GE 7EA gas turbines as peaking and backup units. Additional power sources include coal, hydro, and wind. Platte River required a backup for its primary unit as well as a backup for any other operating sources. Additionally, they wanted a hedge against short-term market pricing fluctuations, while maintaining strict emissions controls.
解决方案
To meet Platte River's goals, GE installed its OpFlex Fast Start software solution on two of the four GE 7EA, 65 MW gas units. This software-only modification allows for rapid starting and loading of the gas turbines, with a guarantee of 90% base load within 10 minutes, while reducing fuel burn and start-up emissions. The solution was designed to provide a quick and efficient backup for Rawhide’s primary unit and for system emergencies, while also addressing the company's need for a hedge against short-term market pricing fluctuations.
运营影响
  • Platte River Power Authority is now able to quickly start and load two 7EA gas turbines for approximately 117 MW in 10 minutes. These gas turbines can now realistically act as a backup for Rawhide’s primary unit and for system emergencies.
  • The implementation of the OpFlex Fast Start software has resulted in a 30% reduction in fuel burn during start-up, contributing to cost savings and environmental sustainability.
  • The solution has also led to a 50% reduction in CO2 emissions, further enhancing the company's commitment to maintaining strict emissions controls.
数量效益
  • Over 100 MW on grid in less than 10 minutes from start signal
  • 30% less fuel burn during start up
  • 50% less CO2 emissions

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。