Actian > 实例探究 > Modernizing Railroad Infrastructures

Modernizing Railroad Infrastructures

Actian Logo
公司规模
1,000+
地区
  • Europe
国家
  • Spain
产品
  • db4o
  • IRC Control System
技术栈
  • Java
  • Oracle
实施规模
  • Enterprise-wide Deployment
影响指标
  • Innovation Output
  • Productivity Improvements
技术
  • 应用基础设施与中间件 - 数据库管理和存储
  • 应用基础设施与中间件 - 中间件、SDK 和库
适用行业
  • 铁路与地铁
适用功能
  • 物流运输
用例
  • 实时定位系统 (RTLS)
服务
  • 软件设计与工程服务
关于客户
Indra Sistemas is a global company of technology, innovation, and talent. They are a leader in high value-added solutions and services for various sectors including Transport and Traffic, Energy and Industry, Public Administration and Healthcare, Finance, Insurance, Security and Defence, and Telecom and Media. Indra operates in over 100 countries and has 30,000 employees worldwide who share their knowledge of different sectors and countries to find innovative solutions to the challenges that clients face. Indra is the European company that most invests in R&D in its sector.
挑战
Indra Sistemas, a global technology company, was tasked with building the control centers for Spain’s AVE high-speed bullet train system. The company needed a database that could handle the complex and demanding architecture of the integrated high-speed train control system (IRC). The system was designed from a global perspective, integrating information and control from each of the elements that make up a high-speed rail line. The architecture used by Indra includes three areas of management allowing for different degrees of accessibility and control of the line. The Real-time System Control Framework consists of over 30,000 objects in memory and 30 classes, with 80 TB of information eventually flowing into Oracle’s relational database on the corporate level.
解决方案
Indra chose the db4o object database to manage and control in all three layers of the system connecting to a relational database in the corporate network. The IRC system leverages db4o as a key data management element. db4o provides a single data model systemwide, allowing centralized monitoring, tracking and problem resolution. This element becomes increasingly important as Spain rolls out additional routes on the AVE system. Indra was able to see immediate benefits by integrating db4o into the complex Real Time System Control Framework, using db4o to store the large number of objects necessary to represent the railways real-time state. db4o’s speed allows the system to process over 200,000 objects per second.
运营影响
  • db4o provides a single data model systemwide, allowing centralized monitoring, tracking and problem resolution.
  • db4o’s speed allows the system to process over 200,000 objects per second.
  • db4o is optimized to run in a minimal footprint and requires zero administration.
  • db4o is native to both Java and .NET programming frameworks, allowing developers to store objects directly.
数量效益
  • The system can process over 200,000 objects per second.
  • The Real-time System Control Framework consists of over 30,000 objects in memory and 30 classes, with 80 TB of information eventually flowing into Oracle’s relational database on the corporate level.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。