技术
- 基础设施即服务 (IaaS) - 公共云
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 建筑与基础设施
- 设备与机械
适用功能
- 物流运输
- 质量保证
用例
- 施工管理
- 基础设施检查
服务
- 云规划/设计/实施服务
- 测试与认证
关于客户
Mediaset España 是西班牙视听市场的领导者,拥有线性和数字平台、免费电视频道、内容平台、电影制作公司、生产和销售发行实体以及视听通讯社。他们是电视广告市场的领导者,并且由于数字平台和社交媒体的普及,电视覆盖率有所增加。
挑战
Mediaset España 希望在所有平台上向用户提供点播视频,并且需要多 CDN 基础设施来保证优质服务和增强的可用性。
解决方案
Mediaset España 采用了 Fastly 的 CDN,它提供的技术功能可以轻松与其现有架构集成。 Fastly 和 Microsoft Azure 之间的协议有助于降低从公共云提取数据的成本。 Fastly 的 Compute@Edge 允许在边缘进行实时调整和定制视频流,从而消除与公共云的来回过程造成的延迟。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.