技术
- 功能应用 - 产品生命周期管理系统 (PLM)
适用行业
- 设备与机械
适用功能
- 产品研发
客户
未公开
关于客户
一家多元化的全球制造和技术公司,在过程管理、气候技术、网络电源、存储解决方案、专业工具、电器解决方案、电机技术等领域提供广泛的产品和服务
挑战
该客户是一个拥有 65 个部门的企业集团,其中包含多个无法支持单个 PLM 实例的小型部门。该组织在组织和维护公司层面的各种 PLM 实例方面也面临重大挑战。
解决方案
Wipro 构思并创建了“PLM in a Box”解决方案,其中包括:在一个 Box 中托管多个 PLM 实例a.一个数据库实例在一个 Box 中托管多个 PLM 实例的解决方案 b.一个业务单位的多个位置/部门可以有共同的基础设施 c.与技术无关的预打包解决方案标准核心业务流程 b.公司标准和要求的合规性 c.经过全面修补和测试的快速部署模型按业务类型划分的固定范围和成本 b.广泛的培训材料和文档集中托管和应用程序支持由 IT 共享服务托管、管理和支持的解决方案 b.高杠杆支持模型 C.最大限度地降低整体应用程序支持成本
收集的数据
Operating Time, Product Lifecycle, Response Time, Technical Documentation
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.