技术
- 网络安全和隐私 - 数据库安全
- 平台即服务 (PaaS) - 应用开发平台
适用行业
- 设备与机械
适用功能
- 维护
- 质量保证
用例
- 库存管理
- 时间敏感网络
客户
惠普
关于客户
Hewlett-Packard Company,通常简称为 Hewlett-Packard 或 HP,是一家总部位于加利福尼亚州帕洛阿尔托的美国跨国信息技术公司。
挑战
HP 在扩展业务和发展合作伙伴生态系统方面遇到了无效的 BI 工具集。 BI 团队管理传统的 OLAP 多维数据集、定制的 .NET 用户界面和数百个离线报告。系统需要 24-48 小时来刷新数据,甚至更长时间来分析数据。新数据部署耗时三个月,使得数据在准备好使用时就已经过时了。
BI 团队是一个瓶颈,他们在数据分析请求上花费了太多时间,而不是专注于更具战略意义的计划。该团队将数据下载到离线仪表板和报告中,并在整个组织的 Excel 和 PowerPoint 文档中分发。最终用户需要一个自助服务解决方案。
解决方案
Snowflake 用于数据仓库和数据共享工作负载,ThoughtSpot 用于搜索和人工智能驱动分析
HP 选择了 Snowflake 和 ThoughtSpot。借助 ThoughtSpot,任何人都可以使用简单的自然语言来创建新的数据驱动的见解或由整个企业中的其他人生成的表面见解。
通过利用人工智能,ThoughtSpot 不仅可以回答已知问题、检测趋势、识别异常和模式,还可以提出用户不会想到的新问题。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.