日立数据系统 (Hitachi) - 全球制造商将良率提高 90%
技术
- 分析与建模 - 大数据分析
- 平台即服务 (PaaS) - 数据管理平台
适用行业
- 设备与机械
适用功能
- 离散制造
用例
- 过程控制与优化
客户
未公开
关于客户
全球制造商
挑战
该公司的聚合物混合工艺生产的产品质量不稳定,产量有时会低至 50% 或 60%。不良批次的报废造成了巨大的成本,并削弱了生产能力。除了一系列生产参数的变化外,其根本原因还在于不断变化的产品规格。生产工程师无法使用传统方法稳定工艺,因为混合聚合物非常不稳定,而且每种新产品配方只会加剧问题。为了解决这个问题,这家全球制造商需要一种能够提供以下功能的解决方案: • 从机器、传感器、环境和其他来源获取和集成物联网 (IoT) 数据 • 通过关联发现关键因素和最佳工艺参数,可视化分析和优化算法 • 提供深入的流程洞察,实现日常决策支持和持续改进 • 通过机器学习动态和持续优化流程
解决方案
Hitachi 提供了一个先进的分析平台,该平台集成了广泛的生产数据和传感器数据输出,以可视化、分析和诊断混合过程。这种新的洞察力使生产工程团队能够了解大量变量的相关性和因果关系。通过添加机器学习功能,该解决方案能够进行持续的工艺调整,从而在几个月内提高产量。
收集的数据
Accuracy, Process Parameters, Product Lifecycle, Production Efficiency, Throughput Per Plant
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.