B2W Software > 实例探究 > Fowler Construction Case Study

Fowler Construction Case Study

B2W Software Logo
公司规模
1,000+
地区
  • America
国家
  • Canada
产品
  • B2W Estimate
  • B2W Track
  • B2W Dispatch
  • B2W Maintain
技术栈
  • ONE (Operational Networked Elements) platform
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Productivity Improvements
技术
  • 平台即服务 (PaaS) - 应用开发平台
适用行业
  • 建筑与基础设施
适用功能
  • 离散制造
  • 采购
用例
  • 自动化制造系统
  • 预测性维护
服务
  • 软件设计与工程服务
  • 系统集成
关于客户
Fowler Construction is a heavy construction and residential services provider based in Bracebridge, Ontario. The company was founded in 1949 and has since been committed to staying up-to-date with the latest technology in every aspect of its business. Fowler Construction's work spans across several industries, including site development, road construction, excavation, paving, materials, landscaping, golf courses, and recreational courts. The company has been a client of B2W Software since 2000 and has attended four B2W User Conferences.
挑战
Fowler Construction, a company providing a wide variety of heavy construction and residential services, was struggling with an outdated Excel spreadsheet-based system for estimating and bidding, field tracking, and dispatching. The system made it difficult to create and manage crews, leading to time-consuming processes and increased chances of errors. The company needed a solution that could streamline these processes, reduce errors, and improve efficiency.
解决方案
Fowler Construction implemented B2W Software's solutions to replace its existing system. The B2W Estimate solution was used to standardize estimating and bidding. This solution saved time and reduced errors by eliminating redundant data entry. It also featured reusable task templates, making it easy to create an estimate based on previous work. With global edits, data could be updated in one place and applied across the estimate. The B2W Estimate phases and reporting capabilities helped Fowler personnel stay organized and informed about the details of every job. The solution also supported multiple estimators working on one bid at the same time without any slowdown or performance degradation.
运营影响
  • Fowler Construction was able to complete huge estimates more quickly and easily with multiple estimators working on one bid at the same time.
  • The company was able to save time and reduce errors by eliminating redundant data entry.
  • The B2W Estimate phases and reporting capabilities helped Fowler personnel stay organized and informed about the details of every job.

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。