Fixed Route Software Success: Lethbridge Transit
公司规模
1,000+
地区
- America
国家
- Canada
产品
- TripSpark ITS Solution
- Ranger MDTs
- MyRide Website
技术栈
- Web-based Passenger Information System
- Real-time Bus Monitoring
- Paratransit Software System
实施规模
- Enterprise-wide Deployment
影响指标
- Customer Satisfaction
- Digital Expertise
- Productivity Improvements
技术
- 功能应用 - 企业资源规划系统 (ERP)
- 功能应用 - 远程监控系统
适用行业
- 城市与自治市
- 运输
适用功能
- 商业运营
- 物流运输
用例
- 车队管理
- 预测性维护
- 实时定位系统 (RTLS)
- 远程资产管理
服务
- 软件设计与工程服务
- 系统集成
- 培训
关于客户
The City of Lethbridge, Alberta, Canada, serves a diverse collection of transit users, including a large number of college-aged students and an aging population. Lethbridge Transit (LT) operates a fixed route system with 40 vehicles and also provides paratransit services. Abby Slovack, a transit planner, oversees technology purchasing and planning to meet the needs of LT’s ridership. Funding is a significant aspect of her role, with much of it directed towards purchasing ITS fixed route software and paratransit software solutions. The goal is to find a balance between ease-of-use for dispatchers and staff while ensuring smooth IT operations.
挑战
Lethbridge Transit faced the challenge of tracking both fixed route and paratransit vehicles while improving boarding processes and reducing late cancellations. The city needed a solution that would balance ease-of-use for dispatchers and staff with smooth IT operations. Additionally, they sought to enhance customer satisfaction by providing accurate and timely information to riders, reducing wait times, and improving overall service efficiency.
解决方案
Lethbridge Transit implemented TripSpark’s complete ITS solution for both fixed route and demand response operations. The ITS solution transformed their entire operation, encouraging staff to work more efficiently. Drivers benefited from in-vehicle MDTs (Ranger units), which allowed them to focus on driving and customer service. The Ranger units served as a single point of logon to the integrated system, automating many tasks and enabling drivers to make schedule adjustments for more efficient routes. The ability to monitor buses in real-time and review daily events helped resolve schedule adherence issues. The integration of fixed and paratransit software and hardware with scheduling and routing software was a key factor in choosing TripSpark. This single-vendor approach ensured seamless integration of all components, including downtown signs and the MyRide website, which provided accurate information to riders. The web-based passenger information system allowed riders to access schedules, locate buses, and plan trips easily from any web-enabled device or telephone. The paratransit software system improved driver efficiency by enabling precise vehicle location monitoring and offering same-day bookings. The notification system reduced late cancellations and no-shows by alerting riders before their vehicle arrived. The self-service trip portal allowed riders to book, cancel, and manage trips online, providing convenience without the need for additional staff.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Turning A Stadium Into A Smart Building
Honeywell created what it called the “intelligent system” for the National Stadium in Beijing, China, turning the venue for the opening and closing events at the 2008 Summer Olympics into a “smart building.” Designed by highly controversial artist Ai Weiwei, the “Bird’s Nest” remains one of the most impressive feats of stadium architecture in the world. The 250,000 square meter structure housed more than 100,000 athletes and spectators at a time. To accommodate such capacity, China turned to Honeywell’s EBI Integrated Building Management System to create an integrated “intelligent system” for improved building security, safety and energy efficiency.
Case Study
Smart Street Light Network (Copenhagen)
Key stakeholders are taking a comprehensive approach to rethinking smart city innovation. City leaders have collaborated through partnerships involving government, research institutions and solution providers. The Copenhagen Solutions Lab is one of the leading organizations at the forefront of this movement. By bringing together manufacturers with municipal buyers, the Copenhagen Solutions Lab has catalyzed the development and deployment of next-generation smart city innovations. Copenhagen is leveraging this unique approach to accelerate the implementation of smart city solutions. One of the primary focus areas is LED street lighting.
Case Study
Airport SCADA Systems Improve Service Levels
Modern airports are one of the busiest environments on Earth and rely on process automation equipment to ensure service operators achieve their KPIs. Increasingly airport SCADA systems are being used to control all aspects of the operation and associated facilities. This is because unplanned system downtime can cost dearly, both in terms of reduced revenues and the associated loss of customer satisfaction due to inevitable travel inconvenience and disruption.
Case Study
IoT-based Fleet Intelligence Innovation
Speed to market is precious for DRVR, a rapidly growing start-up company. With a business model dependent on reliable mobile data, managers were spending their lives trying to negotiate data roaming deals with mobile network operators in different countries. And, even then, service quality was a constant concern.
Case Study
Buoy Status Monitoring with LoRa
The Netherlands are well-known for their inland waterways, canals, sluices and of course port activities. The Dutch Ministry of Infrastructure indicates that there are thousands of buoys and fixed items in and near water environments that would profit from IoT monitoring. One of the problems with buoys for example, is that they get hit by ships and the anchor cable breaks. Without connectivity, it takes quite some time to find out that something has happened with that buoy. Not to mention the costs of renting a boat to go to the buoy to fix it. Another important issue, is that there is no real-time monitoring of the buoys at this moment. Only by physically visiting the object on the water, one gains insight in its status.