公司规模
Large Corporate
地区
- America
国家
- United States
产品
- Documoto
技术栈
- SaaS
实施规模
- Enterprise-wide Deployment
影响指标
- Productivity Improvements
- Customer Satisfaction
技术
- 平台即服务 (PaaS) - 数据管理平台
适用行业
- 设备与机械
适用功能
- 销售与市场营销
- 商业运营
用例
- 库存管理
- 供应链可见性(SCV)
服务
- 云规划/设计/实施服务
关于客户
Excel Industries is a leading manufacturer of outdoor power equipment products for turf and mowing. The company has been in the industry for over 50 years and is known for its innovative product, 'The Hustler', which was the first zero-turn mower. This product revolutionized the efficiency of cutting lawns due to its ability to turn 180 degrees at the end of a mowing row. Excel Industries sells residential and commercial mowers across the globe and strives to provide a quality owner experience. The company has a dealer network of more than 1,600 U.S. dealers and 30 distributors worldwide who work tirelessly to answer questions and provide expert service to every customer. Accurate parts lookup and ordering for dealers is paramount to Excel’s customer service.
挑战
Excel Industries, a leading outdoor power equipment manufacturer, was facing a significant challenge with their parts lookup and ordering system. The company was dependent on a third-party provider to make changes to their parts books and manuals, which was a time-consuming process that often took five to six months to implement. This delay resulted in dealers and distributors being unsure if they were ordering the right part or accessory, damaging the trust between the company and their network. The inaccurate parts data also began impacting Excel’s costs and bottom line, with one instance of a mislabeled transmission resulting in significant shipping costs and a 30-day delay to fix the error.
解决方案
Excel Industries decided to take control of their parts information and began researching software solutions that would improve their parts accuracy and reduce ordering errors. They chose Documoto due to its relational database, cloud library, search capabilities, and the ability to update content themselves. The implementation of Documoto involved a careful plan to migrate thousands of documents and roll out the new system to their dealer network. Excel worked closely with Documoto account managers to ensure a smooth transition and provided training materials to their dealers. Once the data had been migrated into Documoto, Excel was able to make changes to their parts information within hours, significantly reducing the time it took to get changes out to dealers.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.