Ensuring Merchandising Compliance from 35,000 Feet
公司规模
1,000+
地区
- America
国家
- United States
产品
- RetailNext Merchandising Solution
技术栈
- Image Snapshots
- Annotated Notes
实施规模
- Enterprise-wide Deployment
影响指标
- Customer Satisfaction
- Productivity Improvements
技术
- 功能应用 - 库存管理系统
- 功能应用 - 远程监控系统
适用行业
- 零售
适用功能
- 商业运营
- 销售与市场营销
用例
- 库存管理
- 远程控制
- 零售店自动化
服务
- 软件设计与工程服务
- 系统集成
关于客户
Lolli and Pops is a purveyor of sweetness whose stores are stocked to the rafters with sweets from around the world, sourced from both famed producers and local artisans, changing daily based on batch size and availability. Lolli and Pops measures the quality of its sweets not only by their origin, but by the memories they evoke and the smiles they create. The teams in over 40 locations across the United States are committed to sweetening their customers’ day.
挑战
As the vice president of product at Lolli and Pops, Jessica Mennella leads the buying team and is responsible for much of the visual merchandising at the company’s stores across the United States. Each store location has a wide selection of confectionery SKUs, and for its scooped sweets and bulk items, stores have up to 350 bins or more. Re-assorting and setting the stores can be a difficult challenge, involving many meetings with Jessica’s planning team, and often requiring a lot of travel. On a flight from Chicago to San Francisco, Jessica found herself chatting online with her planner. As they discussed 10-15 stores, each with a slightly different layout that had been planned to roughly 80 percent, they struggled to finish and to fine-tune the layout, facing issues like where to visually place dark chocolates in a store filled with sours.
解决方案
The RetailNext merchandising solution allowed Jessica to observe snapshots of stores, displays, fixtures, and product assortment. Despite low-bandwidth airplane Wi-Fi, Jessica was able to go in-store and see how stores were laid out, pulling up still image snapshots from the locations, taking screenshots, and emailing the images –annotated with notes -to her planner. Upon arrival, Jessica and her planner had finished the exercise, finalizing the merchandising layout in every store.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Improving Production Line Efficiency with Ethernet Micro RTU Controller
Moxa was asked to provide a connectivity solution for one of the world's leading cosmetics companies. This multinational corporation, with retail presence in 130 countries, 23 global braches, and over 66,000 employees, sought to improve the efficiency of their production process by migrating from manual monitoring to an automatic productivity monitoring system. The production line was being monitored by ABB Real-TPI, a factory information system that offers data collection and analysis to improve plant efficiency. Due to software limitations, the customer needed an OPC server and a corresponding I/O solution to collect data from additional sensor devices for the Real-TPI system. The goal is to enable the factory information system to more thoroughly collect data from every corner of the production line. This will improve its ability to measure Overall Equipment Effectiveness (OEE) and translate into increased production efficiencies. System Requirements • Instant status updates while still consuming minimal bandwidth to relieve strain on limited factory networks • Interoperable with ABB Real-TPI • Small form factor appropriate for deployment where space is scarce • Remote software management and configuration to simplify operations
Case Study
How Sirqul’s IoT Platform is Crafting Carrefour’s New In-Store Experiences
Carrefour Taiwan’s goal is to be completely digital by end of 2018. Out-dated manual methods for analysis and assumptions limited Carrefour’s ability to change the customer experience and were void of real-time decision-making capabilities. Rather than relying solely on sales data, assumptions, and disparate systems, Carrefour Taiwan’s CEO led an initiative to find a connected IoT solution that could give the team the ability to make real-time changes and more informed decisions. Prior to implementing, Carrefour struggled to address their conversion rates and did not have the proper insights into the customer decision-making process nor how to make an immediate impact without losing customer confidence.
Case Study
Digital Retail Security Solutions
Sennco wanted to help its retail customers increase sales and profits by developing an innovative alarm system as opposed to conventional connected alarms that are permanently tethered to display products. These traditional security systems were cumbersome and intrusive to the customer shopping experience. Additionally, they provided no useful data or analytics.
Case Study
Ensures Cold Milk in Your Supermarket
As of 2014, AK-Centralen has over 1,500 Danish supermarkets equipped, and utilizes 16 operators, and is open 24 hours a day, 365 days a year. AK-Centralen needed the ability to monitor the cooling alarms from around the country, 24 hours a day, 365 days a year. Each and every time the door to a milk cooler or a freezer does not close properly, an alarm goes off on a computer screen in a control building in southwestern Odense. This type of alarm will go off approximately 140,000 times per year, equating to roughly 400 alarms in a 24-hour period. Should an alarm go off, then there is only a limited amount of time to act before dairy products or frozen pizza must be disposed of, and this type of waste can quickly start to cost a supermarket a great deal of money.
Case Study
Supermarket Energy Savings
The client had previously deployed a one-meter-per-store monitoring program. Given the manner in which energy consumption changes with external temperature, hour of the day, day of week and month of year, a single meter solution lacked the ability to detect the difference between a true problem and a changing store environment. Most importantly, a single meter solution could never identify root cause of energy consumption changes. This approach never reduced the number of truck-rolls or man-hours required to find and resolve issues.