技术
- 应用基础设施与中间件 - 事件驱动型应用
- 平台即服务 (PaaS) - 设备管理平台
适用行业
- 设备与机械
- 国家安全与国防
用例
- 自主运输系统
- 篡改检测
客户
电动汽车集团
关于客户
EV Group是半导体、MEMS、化合物半导体、功率器件和纳米技术器件制造的大批量生产设备和工艺解决方案的领先供应商。它支持由全球客户和合作伙伴组成的复杂网络,在全球拥有 1100 多名员工。
挑战
随着 EV Group 的数字基础设施变得越来越复杂,该团队试图通过超越其现有安全工具所依赖的基于日志的分析来提高其安全地位。他们基于日志的 SIEM 技术很好地概述了数字资产,但在网络流量层缺乏数据包级别的洞察力意味着安全事件没有得到足够快的识别和控制。
主要目的是最小化事件发生和被确认之间的时间。
解决方案
因此,该团队将 Darktrace 与其他工具并排进行了测试,决定使用 Darktrace 的自学习 AI 主要是因为其检测的准确性。
Darktrace 揭示了该组织的数字资产,揭示了该团队以前没有意识到的许多问题。该技术帮助安全团队在清理他们的数字基础设施和确保长期更强大的安全方面更具战略性。
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.