Breaking through the Parisian Skyline
公司规模
SME
地区
- Europe
国家
- France
产品
- Vectorworks Architect
技术栈
- 2D Design
- 3D Design
实施规模
- Enterprise-wide Deployment
影响指标
- Innovation Output
- Brand Awareness
- Customer Satisfaction
技术
- 应用基础设施与中间件 - 数据可视化
- 功能应用 - 远程监控系统
适用行业
- 建筑与基础设施
适用功能
- 商业运营
- 设施管理
用例
- 楼宇自动化与控制
- 建筑能源管理
- 智慧城市运营
服务
- 软件设计与工程服务
- 系统集成
关于客户
HAMONIC + MASSON & Associés is an architectural firm based in France, known for its innovative and functional designs. The firm was founded in 1997 by members of the French Touch Association, a group that promotes architecture education and dialogue among architects. Over the years, HAMONIC + MASSON has received multiple accolades for their work, including the Architecture et Maître d’Ouvrage (AMO) 2011 Spécial Saint-Gobain award and a nomination for the Mies Van Der Rohe Award in 2003. The firm has 15 associates who work on various projects throughout France, including cultural facilities, schools, commercial buildings, offices, and residential projects. Their guiding principles focus on functionality for their clients while experimenting with classic architectural designs.
挑战
Over the last several decades, French law has imposed strict height limits to keep the historic and iconic skyline of Paris purposefully low. However, with the rising population, there was a need to amend these laws to allow for taller buildings. In November 2011, the Paris City Council amended the urban planning laws for the Massena-Bruneseau area, raising the height limitation on housing blocks from 37 to 50 meters. This change was seen as a historic move that would forever alter the landscape of Paris. HAMONIC + MASSON & Associés, an architectural firm, was one of the first to capitalize on this change, partnering with Comte Vollenweider Architects to design the ZAC Masséna Paris Rive Gauche high-rise. The project aimed to create a remarkable building that combined offices, private housing, social housing, and parking, while also offering beautiful architecture.
解决方案
HAMONIC + MASSON turned to Vectorworks Architect software to design the dual-towered structure of the ZAC Masséna Paris Rive Gauche high-rise. The project, which will be delivered at the beginning of 2015, is the first 50-meter-tall housing solution to be built in Paris since the 1970s. The design features two towers with 17 stories of public housing in one and 14 stories of privately owned flats in the other, combining for 200 units. Both towers rest on a common base filled with shops that open up onto the Avenue de France. The architects aimed to create a building that not only broke through the old height barrier but also bridged the divide between public and private housing. They were inspired by the concept of heliotropism, ensuring that the sun would always shine into some of the apartments due to the varied orientations of the towers. This design makes the interior spaces seem larger and more open to the bustling streets and picturesque riverfront outside.
运营影响
数量效益
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.
Case Study
Condition Based Monitoring for Industrial Systems
A large construction aggregate plant operates 10 high horsepower Secondary Crusher Drive Motors and associated conveyor belts, producing 600 tons of product per hour. All heavy equipment requires maintenance, but the aggregate producer’s costs were greatly magnified any time that the necessary maintenance was unplanned and unscheduled. The product must be supplied to the customers on a tight time schedule to fulfill contracts, avoid penalties, and prevent the loss of future business. Furthermore, a sudden failure in one of the drive motors would cause rock to pile up in unwanted locations, extending the downtime and increasing the costs.Clearly, preventative maintenance was preferable to unexpected failures. So, twice each year, the company brought in an outside vendor to attach sensors to the motors, do vibration studies, measure bearing temperatures and attempt to assess the health of the motors. But that wasn’t enough. Unexpected breakdowns continued to occur. The aggregate producer decided to upgrade to a Condition Based Monitoring (CBM) sensor system that could continually monitor the motors in real time, apply data analytics to detect changes in motor behavior before they developed into major problems, and alert maintenance staff via email or text, anywhere they happened to be.A wired sensor network would have been cost prohibitive. An aggregate plant has numerous heavy vehicles moving around, so any cabling would have to be protected. But the plant covers 400 acres, and the cable would have to be trenched to numerous locations. Cable wasn’t going to work. The aggregate producer needed a wireless solution.