AVEVA (Schneider Electric) > 实例探究 > AVEVA Helps Atkins Maintain a Competitive Edge

AVEVA Helps Atkins Maintain a Competitive Edge

AVEVA (Schneider Electric) Logo
公司规模
1,000+
地区
  • Pacific
国家
  • Australia
产品
  • AVEVA Everything3D (AVEVA E3D)
技术栈
  • 3D laser scanning
  • AutoCAD
实施规模
  • Enterprise-wide Deployment
影响指标
  • Cost Savings
  • Productivity Improvements
技术
  • 应用基础设施与中间件 - 数据可视化
适用行业
  • 建筑与基础设施
适用功能
  • 离散制造
用例
  • 数字孪生
服务
  • 软件设计与工程服务
关于客户
Atkins is one of the world’s leading design, engineering and project management consultancies, employing some 18,000 people across the UK, North America, Middle East, Asia Pacific and Europe. Its breadth and depth of expertise, and its drive to continually ask ‘why’, has enabled the company to plan, design and deliver some of the world’s most complex and time-critical projects. The company operates in Western Australia, a region known for its high cost of doing business. This necessitates the company to be particularly efficient in adding value to remain competitive in the global market.
挑战
Atkins, a leading design, engineering and project management consultancy, operates in Western Australia, a region known for its high cost of doing business. This necessitates the company to be particularly efficient in adding value to remain competitive in the global market. The majority of Atkins’ projects are brownfield ones with difficult access conditions and often inaccurate or incomplete-as-built information available. Traditional surveying techniques can be slow and costly. 3D laser scanning offers a quicker, cheaper and more efficient alternative; however, Atkins needed a 3D design tool that had tight point cloud integration.
解决方案
Atkins decided to put AVEVA at the centre of its engineering. The use of AutoCAD was abandoned and drawings were generated directly from PDMS instead. Atkins had no hesitation in migrating to AVEVA E3D and updating its PDMS-based procedures to take advantage of the new capabilities. Atkins used AVEVA E3D on the Varanus Island Compression Project (VICP) for Apache Energy. This highly collaborative, 8,500-man-hour project involved all engineering disciplines, as well as the client, at each step of the design process. Modular design enabled Atkins to run multiple teams in tandem to fasttrack the work. As a result, they were able to deliver the completed design in just 13 weeks. Atkins is in the process of launching its new global design strategy, in which AVEVA technology will play a prominent role.
运营影响
  • Design efficiency has been increased by 40%.
  • Global deployments are now set up in days, not months.
  • Atkins is overall more competitive in the world market.
数量效益
  • Design efficiency has been increased by 40%
  • Global deployments are now set up in days, not months

Case Study missing?

Start adding your own!

Register with your work email and create a new case study profile for your business.

Add New Record

相关案例.

联系我们

欢迎与我们交流!
* Required
* Required
* Required
* Invalid email address
提交此表单,即表示您同意 IoT ONE 可以与您联系并分享洞察和营销信息。
不,谢谢,我不想收到来自 IoT ONE 的任何营销电子邮件。
提交

感谢您的信息!
我们会很快与你取得联系。