Case Studies.

Add Case Study

Our Case Study database tracks 18,927 case studies in the global enterprise technology ecosystem.
Filters allow you to explore case studies quickly and efficiently.

Download Excel
Filters
  • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
  • (1)
    • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (1)
  • (2)
Selected Filters
2 case studies
Sort by:
Fleet Management Solution - Altiux Innovations Industrial IoT Case Study
Fleet Management Solution
A major trucking company in Africa was looking for a solution to track and manage their fleet of vehicles. Tracking was essential to ensure that the trucks were being driven safely and on the most optimal route.
Download PDF
Reduce the Energy Consumption of Air Cooled Condensers - Altiux Innovations Industrial IoT Case Study
Reduce the Energy Consumption of Air Cooled Condensers
Altiux's client organization is at the forefront of technology adoption in its manufacturing processes and had already implemented advanced control systems. However operating expenses still remained on the higher side due to inefficiencies in certain processes which required manual intervention. The challenge for Altiux was to understand the nature and root causes of these inefficiencies and make recommendations for reducing the operating expenses. Our observation was that data was being generated with a millisecond level resolution and hundreds of simultaneous fluctuations made it near impossible for the operators to make optimal control decisions consistently. As significant investments had already been made in the instrumentation of the operational equipment, the management was hesitant to make modifications to existing systems and processes. Altiux was asked to make recommendations such that it could blend in with existing processes and additional capital expenditure or staff retraining was not required. The Air Cooled Condenser system at the client's captive power plant was operated using a series of VFD fans. The rotational speed of these fans were being manually set from the control centre, based upon the experience of the operator. Moreover the fans were being operated in different speeds, with fans closer to the turbine operating at near full speed. Thus the first phase of Altiux engagement involved optimization of the captive power plant's steam cooling subsystem.
Download PDF

Contact us

Let's talk!
* Required
* Required
* Required
* Invalid email address
By submitting this form, you agree that IoT ONE may contact you with insights and marketing messaging.
No thanks, I don't want to receive any marketing emails from IoT ONE.
Submit

Thank you for your message!
We will contact you soon.