How John W. Danforth Uses Raken to Track Productivity and Help Defend Contracts
Customer Company Size
Large Corporate
Region
- America
Country
- United States
Product
- Raken
Tech Stack
- Real-time Production Insights
- Digital Data Storage
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Customer Satisfaction
Technology Category
- Functional Applications - Remote Monitoring & Control Systems
- Analytics & Modeling - Real Time Analytics
Applicable Industries
- Construction & Infrastructure
- Professional Service
Applicable Functions
- Business Operation
- Quality Assurance
Use Cases
- Track & Trace of Assets
- Predictive Maintenance
Services
- Software Design & Engineering Services
- System Integration
About The Customer
The John W. Danforth Company, established over 137 years ago, is a prominent mechanical contractor in the Northeastern United States. Known for providing high-quality, turn-key mechanical solutions, Danforth serves a diverse range of industries including manufacturing, healthcare, education, hospitality, technology, and entertainment. The company has been recognized for its excellence, being named Contractor Magazine’s 2020 Contractor of the Year. With a reputation for delivering reliable and efficient services, Danforth has built a strong client base across various sectors. The company is committed to innovation and excellence, continuously seeking ways to improve its operations and deliver superior results to its clients. As a large corporate entity, Danforth manages over 120 projects at any given time, necessitating efficient project management and data tracking systems to maintain its high standards of service.
The Challenge
As one of the largest mechanical contractors in the Northeastern US, J.W. Danforth faced challenges in maintaining accurate historical data due to inconsistent paper reports and spreadsheets. The varying metrics among project managers made tracking projects difficult, and they needed a less manual way to assess the status of labor and productivity on their projects. The lack of a uniform reporting system meant that comparing estimates to budgets was nearly impossible, leading to inefficiencies and potential financial losses. The COVID-19 pandemic further complicated matters, impacting labor productivity due to project shutdowns and changing safety protocols. Danforth needed a solution that could provide real-time insights into their projects, standardize data reporting, and help them defend their work during disputes.
The Solution
To address the challenges of inconsistent data and manual tracking, J.W. Danforth implemented Raken's real-time production insights. This solution provided Danforth with the ability to track progress and make informed decisions quickly. With Raken, Danforth gained real-time visibility into labor productivity, allowing them to compare estimated productivity with actual results. This enabled them to direct additional support to field leaders when issues arose, ensuring that projects stayed on track. The standardized data reporting facilitated by Raken allowed Danforth to compare jobs, identify areas of improvement, and communicate these insights across the organization. During the COVID-19 pandemic, the real-time data proved invaluable in demonstrating the impacts of the pandemic on labor productivity and securing fair compensation for additional costs. Raken's digital data storage and automatic time-stamping of daily logs, photos, and attachments provided Danforth with solid, documented proof to defend their work during disputes. This capability was crucial in successfully defending requests for compensation for contract delays and productivity impacts with the federal government. The user-friendly interface of Raken also improved communication between field leaders and management, enabling Danforth to act swiftly on project updates and maintain productivity.
Operational Impact
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.
Case Study
Splunk Partnership Ties Together Big Data & IoT Services
Splunk was faced with the need to meet emerging customer demands for interfacing IoT projects to its suite of services. The company required an IoT partner that would be able to easily and quickly integrate with its Splunk Enterprise platform, rather than allocating development resources and time to building out an IoT interface and application platform.
Case Study
Bridge monitoring in Hamburg Port
Kattwyk Bridge is used for both rail and road transport, and it has played an important role in the Port of Hamburg since 1973. However, the increasing pressure from traffic requires a monitoring solution. The goal of the project is to assess in real-time the bridge's status and dynamic responses to traffic and lift processes.
Case Study
Bellas Landscaping
Leading landscaping firm serving central Illinois streamlines operations with Samsara’s real-time fleet tracking solution: • 30+ vehicle fleet includes International Terrastar dump trucks and flatbeds, medium- and light-duty pickups from Ford and Chevrolet. Winter fleet includes of snow plows and salters.
Case Study
Condition Based Monitoring for Industrial Systems
A large construction aggregate plant operates 10 high horsepower Secondary Crusher Drive Motors and associated conveyor belts, producing 600 tons of product per hour. All heavy equipment requires maintenance, but the aggregate producer’s costs were greatly magnified any time that the necessary maintenance was unplanned and unscheduled. The product must be supplied to the customers on a tight time schedule to fulfill contracts, avoid penalties, and prevent the loss of future business. Furthermore, a sudden failure in one of the drive motors would cause rock to pile up in unwanted locations, extending the downtime and increasing the costs.Clearly, preventative maintenance was preferable to unexpected failures. So, twice each year, the company brought in an outside vendor to attach sensors to the motors, do vibration studies, measure bearing temperatures and attempt to assess the health of the motors. But that wasn’t enough. Unexpected breakdowns continued to occur. The aggregate producer decided to upgrade to a Condition Based Monitoring (CBM) sensor system that could continually monitor the motors in real time, apply data analytics to detect changes in motor behavior before they developed into major problems, and alert maintenance staff via email or text, anywhere they happened to be.A wired sensor network would have been cost prohibitive. An aggregate plant has numerous heavy vehicles moving around, so any cabling would have to be protected. But the plant covers 400 acres, and the cable would have to be trenched to numerous locations. Cable wasn’t going to work. The aggregate producer needed a wireless solution.