Customer Company Size
Large Corporate
Region
- America
Country
- Canada
Product
- IBM Kenexa LCMS Premier on Cloud
Tech Stack
- Cloud Computing
- Learning Content Management System
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Employee Satisfaction
Technology Category
- Platform as a Service (PaaS) - Application Development Platforms
Applicable Industries
- Mining
Applicable Functions
- Human Resources
Services
- Cloud Planning, Design & Implementation Services
About The Customer
PotashCorp is the world’s largest fertilizer company by capacity, producing the three primary crop nutrients: potash, nitrogen and phosphate. It has a global footprint and plays an important role in helping the world grow the food it needs. As the world’s population continues to increase, companies like PotashCorp are supporting ways to grow more food with the available land and resources. PotashCorp is the world’s largest producer of potash—a primary ingredient in crop fertilizers—and its Canadian operation represent one-fifth of the global capacity. Phosphate and nitrogen are also important aspects of PotashCorp’s offering. Mining potash and phosphate and capturing nitrogen are complex processes, and worker safety is a key concern at PotashCorp.
The Challenge
PotashCorp, the world’s largest fertilizer company, aims to become one of the safest resource companies in the world. To achieve this, it needed to deliver consistent, high-quality training to more than 5,000 employees working at multiple remote sites. In the past, each site developed its own training materials. This created substantial duplication of effort and made it difficult to ensure that each site was in compliance with the latest corporate and regulatory best practices. PotashCorp needed a way to develop and deliver standard training materials to every work site, no matter how remote.
The Solution
To ensure that its training was consistent company-wide, PotashCorp initially looked to implement a learning management system (LMS). However, during her research, Candace Laing, Senior Director of Organization and Talent Development at PotashCorp, quickly discovered that an LMS alone would be unable to meet all of PotashCorp’s learning needs. What was missing from PotashCorp’s strategy was a learning content management system (LCMS). After a nine-week implementation, PotashCorp has begun taking advantage of its new LCMS to configure course templates in multiple formats, and to publish training programs with interactive components. This will help increase the quality of training materials as PotashCorp pursues world-class safety performance.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Underground Mining Safety
The goal was to produce a safety system to monitor and support underground mining operations; existing systems were either too simple (i.e. phone line) or overly complex and expensive, inhibiting deployment, and providing little-to-no support in event of an accident. Given the dangerous nature of the mining work environment and the strict regulations placed on the industry, the solution would have to comply with Mine Safety and Health Administration (MSHA) regulations. Yet the product needed to allow for simple deployment to truly be a groundbreaking solution - increasing miner safety and changing daily operations for the better.
Case Study
Mining Firm Quadruples Production, with Internet of Everything
Dundee Precious Metal’s flagship mine, in Chelopech, Bulgaria, produces a gold, copper, and silver concentrate set a goal to increase production by 30%. Dundee wanted to increase production quality and output without increasing headcount and resources, improve miner safety, and minimize cost.
Case Study
Fastenal Builds the Future of Manufacturing with MachineMetrics
Fastenal's objective was to better understand their machine downtime, utilization, quality issues, and to embrace cutting-edge manufacturing technology/process improvement capabilities to bring their team to the next level. However, there was a lack of real-time data, visualization, and actionable insights made this transition impossible.
Case Study
Joy Mining Systems
Joy equipment faces many challenges. The first is machine integration and control. The business end of the machine has a rapidly-spinning cylinder with 6-inch diamond-studded cutting teeth. It chews through rock at rates measured in tens of tons per minute. The system grinds through the rock in front, creating a rectangular mine tunnel. Hydraulic lifters support the ceiling as the machine moves forward. Automated drills and screws drive 3-ft long screws into the ceiling to stabilize it. The rock and coal fall into a set of gathering "fingers" below the cutting cylinder. These fingers scoop up the rock and coal and deposit it onto a conveyor belt. The conveyor passes under the machine and out the back. A train of conveyor belt cars, up to a mile long, follows the cutter into the mine. The rock shoots along this train at over 400 feet per minute until it empties into rail cars at the end. Current systems place an operator cage next to the cutter. Choking dust (potentially explosive), the risk of collapse and the proximity of metal and rock mayhem make the operator cage a hazardous location.
Case Study
Improved Monitoring in Industrial Manufacturing Facility
When your crane is moving tons of magma-hot iron, you can’t afford an unexpected failure. McWane Ductile knew monitoring the crane motor metrics within their facility could help prevent a mechanical failure that would strand an enormous bucket of molten metal overhead. Unfortunately, their legacy wired monitoring system couldn’t work with moving objects in this extreme environment. If they could integrate wireless capabilities into their existing equipment they could extend their monitoring capabilities without starting over from scratch.