Customer Company Size
Large Corporate
Region
- Asia
Country
- Israel
Product
- IBM GTS Infrastructure Services – Resiliency Services
- IBM Prefabricated Modular Data Center
- Schneider Electric Data Center Solutions and Services
Tech Stack
- Data Center Infrastructure
- Resiliency Services
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Cost Savings
- Productivity Improvements
- Energy Saving
Technology Category
- Infrastructure as a Service (IaaS) - Cloud Computing
Applicable Industries
- Healthcare & Hospitals
- Life Sciences
Applicable Functions
- Product Research & Development
- Business Operation
Services
- Cloud Planning, Design & Implementation Services
- System Integration
About The Customer
As part of the Weizmann Institute of Science, the Nancy & Stephen Grand Israel National Center for Personalized Medicine (G-INCPM) is an advanced research facility, providing Israeli scientists with state-of-the-art genomics, protein profiling, drug discovery and bioinformatics resources. Founded in 2012, the G-INCPM helps pave the way for new scientific discoveries that can advance the development of personalized medicine. The organization brings together academic, medical and biomedical industry researchers, giving them access to cutting-edge technology. Researchers require powerful servers and large-capacity storage environments to collect, analyze and store the data produced through research.
The Challenge
As the G-INCPM has grown over the years, it began to reach the limits of its current data center. The IT team needed to expand the capacity of IT resources to support a rising number of researchers and facilitate increasingly complex, data-intensive research. Finding a solution that could be deployed quickly was key; the IT team did not want to slow down the addition of new researchers or place technology limitations on research projects. At the same time, the IT team wanted to retain control over its infrastructure and help ensure the tightest security for research data. The team also wanted to keep any new data center in close physical proximity to its IT staff and existing facilities.
The Solution
IBM® Global Technology Services® (GTS) worked with Schneider Electric to design, build and deploy a Prefabricated Modular Data Center (PMDC) solution. The solution enabled the G-INCPM to add capacity quickly and economically while retaining tight control and security over IT resources. IBM GTS oversaw the processes of designing, building and deploying the PMDC solution. First, GTS worked with the IT team from G-INCPM to define requirements and assemble an initial design concept. The GTS team then worked with Schneider Electric—a global specialist in energy management and automation, and a longtime strategic IBM Business Partner—to develop the plan for building the solution. After completing a detailed design, the GTS team collaborated with the Schneider Electric engineers working in Spain to meet all of the technical requirements of the G-INCPM as well as all of the Israeli import requirements and standards.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Hospital Inventory Management
The hospital supply chain team is responsible for ensuring that the right medical supplies are readily available to clinicians when and where needed, and to do so in the most efficient manner possible. However, many of the systems and processes in use at the cancer center for supply chain management were not best suited to support these goals. Barcoding technology, a commonly used method for inventory management of medical supplies, is labor intensive, time consuming, does not provide real-time visibility into inventory levels and can be prone to error. Consequently, the lack of accurate and real-time visibility into inventory levels across multiple supply rooms in multiple hospital facilities creates additional inefficiency in the system causing over-ordering, hoarding, and wasted supplies. Other sources of waste and cost were also identified as candidates for improvement. Existing systems and processes did not provide adequate security for high-cost inventory within the hospital, which was another driver of cost. A lack of visibility into expiration dates for supplies resulted in supplies being wasted due to past expiry dates. Storage of supplies was also a key consideration given the location of the cancer center’s facilities in a dense urban setting, where space is always at a premium. In order to address the challenges outlined above, the hospital sought a solution that would provide real-time inventory information with high levels of accuracy, reduce the level of manual effort required and enable data driven decision making to ensure that the right supplies were readily available to clinicians in the right location at the right time.
Case Study
Gas Pipeline Monitoring System for Hospitals
This system integrator focuses on providing centralized gas pipeline monitoring systems for hospitals. The service they provide makes it possible for hospitals to reduce both maintenance and labor costs. Since hospitals may not have an existing network suitable for this type of system, GPRS communication provides an easy and ready-to-use solution for remote, distributed monitoring systems System Requirements - GPRS communication - Seamless connection with SCADA software - Simple, front-end control capability - Expandable I/O channels - Combine AI, DI, and DO channels
Case Study
Driving Digital Transformations for Vitro Diagnostic Medical Devices
Diagnostic devices play a vital role in helping to improve healthcare delivery. In fact, an estimated 60 percent of the world’s medical decisions are made with support from in vitrodiagnostics (IVD) solutions, such as those provided by Roche Diagnostics, an industry leader. As the demand for medical diagnostic services grows rapidly in hospitals and clinics across China, so does the market for IVD solutions. In addition, the typically high cost of these diagnostic devices means that comprehensive post-sales services are needed. Wanteed to improve three portions of thr IVD:1. Remotely monitor and manage IVD devices as fixed assets.2. Optimizing device availability with predictive maintenance.3. Recommending the best IVD solution for a customer’s needs.
Case Study
HaemoCloud Global Blood Management System
1) Deliver a connected digital product system to protect and increase the differentiated value of Haemonetics blood and plasma solutions. 2) Improve patient outcomes by increasing the efficiency of blood supply flows. 3) Navigate and satisfy a complex web of global regulatory compliance requirements. 4) Reduce costly and labor-intensive maintenance procedures.
Case Study
Harnessing real-time data to give a holistic picture of patient health
Every day, vast quantities of data are collected about patients as they pass through health service organizations—from operational data such as treatment history and medications to physiological data captured by medical devices. The insights hidden within this treasure trove of data can be used to support more personalized treatments, more accurate diagnosis and more advanced preparative care. But since the information is generated faster than most organizations can consume it, unlocking the power of this big data can be a struggle. This type of predictive approach not only improves patient care—it also helps to reduce costs, because in the healthcare industry, prevention is almost always more cost-effective than treatment. However, collecting, analyzing and presenting these data-streams in a way that clinicians can easily understand can pose a significant technical challenge.