Chemical Industry Case Study – IRMCO
Customer Company Size
SME
Region
- America
Country
- United States
Product
- ProcessPro ERP
Tech Stack
- ERP
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Productivity Improvements
- Cost Savings
Technology Category
- Functional Applications - Enterprise Resource Planning Systems (ERP)
Applicable Industries
- Chemicals
Applicable Functions
- Discrete Manufacturing
Use Cases
- Manufacturing System Automation
- Inventory Management
Services
- Software Design & Engineering Services
- System Integration
About The Customer
IRMCO, established in 1914, is a manufacturer of water-based, environmentally friendly lubricant technologies for the metal-forming industry. IRMCO GEL® was the first water-based gel product for tube bending. IRMCO FLUIDS are a wave of new products spawned from the original Non-Oil Fluids, including IRMCO FLUIDS HIGH STRENGTH FORMULA, a high performance chemistry engineered to control the high heat and friction generated from the new demands of advanced and ultra high strength steel forming.
The Challenge
IRMCO, a manufacturer of water-based, environmentally friendly lubricant technologies for the metal-forming industry, was previously utilizing a discrete manufacturing ERP system. The system was not a proper fit for their process manufacturing business and it wasn’t going to be supported in the future. This compelled IRMCO to research a new ERP solution. The company needed a system that could easily and efficiently track its inventory levels in a real-time environment. They also wanted to streamline their processes, reduce operational costs, and eliminate dual recording of a majority of their inventory transactions.
The Solution
IRMCO decided to implement ProcessPro, a fully integrated and industry specific ERP solution that strongly matched their company’s business operations and objectives. ProcessPro has enabled IRMCO to eliminate manual errors, streamline their business processes and focus on its core business activities with confidence that their decisions are based on accurate information. The implementation of ProcessPro’s ERP solution was completed in February 2013, which included an aggressive timeline for completion. The system was user-friendly and required no major modifications, making the transition for the staff painless.
Operational Impact
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Honeywell - Tata Chemicals Improves Data Accessibility with OneWireless
Tata was facing data accessibility challenges in the cement plant control room tapping signals from remote process control areas and other distant locations, including the gas scrubber. Tata needed a wireless solution to extend its control network securely to remote locations that would also provide seamless communication with existing control applications.
Case Study
Advanced Elastomer Systems Upgrades Production
In order to maintain its share of the international market for thermoplastic elastomers AES recently expanded its Florida plant by adding a new production line. While the existing lines were operating satisfactorily using a PROVOX distributed control system with traditional analog I/O, AES wanted advanced technology on the new line for greater economy, efficiency, and reliability. AES officials were anxious to get this line into production to meet incoming orders, but two hurricanes slowed construction.
Case Study
Wireless GPS Tracking & Security Monitoring
Enhancing the security of hazardous freight and ensuring compliance with Homeland Security’s Transportation Security Administration mandate that all trains carrying chemicals capable of creating a toxic inhalation condition are equipped with on-board safety monitoring systems.
Case Study
Field Device Asset Management For Chemical Company in China
Chinese chemical subsidiary of multinational corporation serves customers throughout the world. Sales offices and research and technology centers are strategically located to provide rapid response to customer requests. Just two workers were assigned to maintain thousands of intelligent instruments in three production units, so they could do little more than react to device issues as they appeared. This costly maintenance method inevitably led to unexpected downtime when a critical instrument failed. Plant management recognized the need to change from reactive to predictive maintenance for all assets, including instruments and control valves, but help was needed in implementing such a technology-based initiative.
Case Study
Industrial Workforce Mobility for Improved Safety & Operations
Huntsman Corporation, a global manufacturer and marketer of differentiated chemicals, undertook an aggressive program to eliminate injuries, product defects, and environmental releases at their Port Neches facility. Termed “Project Zero”, this program required a completely mobile solution to empower operations and maintenance personnel to capture defects, track work progress and make process and safety related decisions in real-time.