Avetta Helps Engineering and Construction Major Streamline Safety Training with Worker Management
Customer Company Size
Large Corporate
Region
- America
Country
- United States
Product
- Avetta Worker Management
Tech Stack
- Automated Training Modules
- Integrated Training Database
Implementation Scale
- Enterprise-wide Deployment
Impact Metrics
- Cost Savings
- Productivity Improvements
- Customer Satisfaction
- Employee Satisfaction
Technology Category
- Functional Applications - Remote Monitoring & Control Systems
- Functional Applications - Enterprise Resource Planning Systems (ERP)
Applicable Industries
- Oil & Gas
- Construction & Infrastructure
Applicable Functions
- Field Services
Use Cases
- Remote Asset Management
Services
- System Integration
- Training
About The Customer
Universal Pegasus International (UPI) has gained a reputation since its formation in 1961 as the world’s foremost off-shore engineering and project management firm, known for its technical expertise in solving engineering problems for clients in the Oil and Gas industry. The company also delivers world-class expertise, efficiency, and value in project management, engineering and construction management for the energy industry, focusing on safety, quality, and ethics in their practices. With worker safety being a primary concern at UPI’s worksite, hiring qualified and well-trained subcontractors became a necessity for the company. UPI needed a solution that could help it simplify onsite training and orientation for its subcontractors.
The Challenge
In order to maintain business continuity and drive competitiveness for large capital projects, UPI had to ensure that it was maintaining a healthy pool of qualified and trained subcontractors. However, the company realized that its subcontractors were not operating at a desired level and knew something had to be done. Training to upskill the subcontractors was a cumbersome task for the company with productive time being spent on repetitive training processes. With the added burden of extra paperwork that kept piling on, the existing training programs were constantly raising the operational cost and making the entire process longer than necessary. Additionally, managing and monitoring subcontractors onsite was an added challenge for the operators. It was clear that UPI needed to overhaul its subcontractor training process. After careful consideration and much deliberation, they decided to collaborate with Avetta and opt for the Worker Management solution.
The Solution
Prior to the arrangement, the entire process of subcontractor training was manual, repetitive, and paper-bound. With Avetta’s Worker Management, UPI managed to automate training and eliminate paperwork while successfully monitoring the subcontractor progress from anytime, anywhere. Unified training process Training modules were deployed across all centers of UPI to ensure an equal level of competency irrespective of location. Customized training modules The training modules could be customized per the topic of UPI’s choice. Consisting of a mixture of presentations and audio visuals, the training modules served as powerful tools. Competency tests In order to add value to the training program, the trainings were topped with competency tests that had to be qualified by each trainee in order to achieve completion. Subcontractor and internal training Modules were deployed to train both the external as well as the internal team that would be a part of the field work in order to eliminate any knowledge gaps, and qualified by each trainee in order to achieve completion. Integrated training database An integrated database allowed UPI with real-time stats and insights into the training completion level with respect to each subcontractors. Screening and filtering contractors on the basis of training completion became achievable with a unified view.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Taking Oil and Gas Exploration to the Next Level
DownUnder GeoSolutions (DUG) wanted to increase computing performance by 5 to 10 times to improve seismic processing. The solution must build on current architecture software investments without sacrificing existing software and scale computing without scaling IT infrastructure costs.
Case Study
Remote Wellhead Monitoring
Each wellhead was equipped with various sensors and meters that needed to be monitored and controlled from a central HMI, often miles away from the assets in the field. Redundant solar and wind generators were installed at each wellhead to support the electrical needs of the pumpstations, temperature meters, cameras, and cellular modules. In addition to asset management and remote control capabilities, data logging for remote surveillance and alarm notifications was a key demand from the customer. Terra Ferma’s solution needed to be power efficient, reliable, and capable of supporting high-bandwidth data-feeds. They needed a multi-link cellular connection to a central server that sustained reliable and redundant monitoring and control of flow meters, temperature sensors, power supply, and event-logging; including video and image files. This open-standard network needed to interface with the existing SCADA and proprietary network management software.
Case Study
Refinery Saves Over $700,000 with Smart Wireless
One of the largest petroleum refineries in the world is equipped to refine various types of crude oil and manufacture various grades of fuel from motor gasoline to Aviation Turbine Fuel. Due to wear and tear, eight hydrogen valves in each refinery were leaking, and each cost $1800 per ton of hydrogen vented. The plant also had leakage on nearly 30 flare control hydrocarbon valves. The refinery wanted a continuous, online monitoring system that could catch leaks early, minimize hydrogen and hydrocarbon production losses, and improve safety for maintenance.
Case Study
IoT System for Tunnel Construction
The Zenitaka Corporation ('Zenitaka') has two major business areas: its architectural business focuses on structures such as government buildings, office buildings, and commercial facilities, while its civil engineering business is targeted at structures such as tunnels, bridges and dams. Within these areas, there presented two issues that have always persisted in regard to the construction of mountain tunnels. These issues are 'improving safety" and "reducing energy consumption". Mountain tunnels construction requires a massive amount of electricity. This is because there are many kinds of electrical equipment being used day and night, including construction machinery, construction lighting, and ventilating fan. Despite this, the amount of power consumption is generally not tightly managed. In many cases, the exact amount of power consumption is only ascertained when the bill from the power company becomes available. Sometimes, corporations install demand-monitoring equipment to help curb the maximum power demanded. However, even in these cases, the devices only allow the total volume of power consumption to be ascertained, or they may issue warnings to prevent the contracted volume of power from being exceeded. In order to tackle the issue of reducing power consumption, it was first necessary to obtain an accurate breakdown of how much power was being used in each particular area. In other words, we needed to be able to visualize the amount of power being consumed. Safety, was also not being managed very rigorously. Even now, tunnel construction sites often use a 'name label' system for managing entry into the work site. Specifically, red labels with white reverse sides that bear the workers' names on both sides are displayed at the tunnel work site entrance. The workers themselves then flip the name label to the appropriate side when entering or exiting from the work site to indicate whether or not they are working inside the tunnel at any given time. If a worker forgets to flip his or her name label when entering or exiting from the tunnel, management cannot be performed effectively. In order to tackle the challenges mentioned above, Zenitaka decided to build a system that could improve the safety of tunnel construction as well as reduce the amount of power consumed. In other words, this new system would facilitate a clear picture of which workers were working in each location at the mountain tunnel construction site, as well as which processes were being carried out at those respective locations at any given time. The system would maintain the safety of all workers while also carefully controlling the electrical equipment to reduce unnecessary power consumption. Having decided on the concept, our next concern was whether there existed any kind of robust hardware that would not break down at the construction work site, that could move freely in response to changes in the working environment, and that could accurately detect workers and vehicles using radio frequency identification (RFID). Given that this system would involve many components that were new to Zenitaka, we decided to enlist the cooperation of E.I.Sol Co., Ltd. ('E.I.Sol') as our joint development partner, as they had provided us with a highly practical proposal.