Technology Category
- Functional Applications - Manufacturing Execution Systems (MES)
- Platform as a Service (PaaS) - Data Management Platforms
Applicable Industries
- Buildings
- Cement
Applicable Functions
- Logistics & Transportation
- Quality Assurance
Use Cases
- Additive Manufacturing
- Visual Quality Detection
Services
- Testing & Certification
About The Customer
Ansaldo Energia is a long-standing company that has been in operation for nearly 200 years. The company specializes in manufacturing generators and turbines for thermoelectric power plants and serves more than 90 countries worldwide. This requires intricate planning of projects and resources to ensure that customers receive their equipment and components on time and perfectly manufactured. Ansaldo Energia uses SAP as its main source of resource planning data, with various departments and teams inputting data into the system. Guglielmo Mantero, a master planner at the company, works closely with the company’s schedulers, building out short- and long-term strategies for Ansaldo Energia’s manufacturing lines and ensuring the supply chain can support the company’s requirements.
The Challenge
Ansaldo Energia, a nearly 200-year-old company manufacturing generators and turbines for thermoelectric power plants in over 90 countries, faced a significant challenge with data quality. The company's main source of resource planning data, SAP, was being polluted with inaccurate data from various departments, negatively impacting the supply chain. This inaccurate data often led to incorrect orders, disrupting the manufacturing schedule and the planning department’s budget. Guglielmo Mantero and his team at Ansaldo Energia were tasked with creating a set of KPIs to ensure the accuracy of their ERP and SCP data. However, they needed a new method to monitor these KPIs, focusing on data quality and the real impact of inaccurate or outdated information on Ansaldo Energia’s manufacturing processes.
The Solution
The solution came in the form of Alteryx, a data analytics tool. Mantero, after being informed of an Alteryx trial within the company, started experimenting with Alteryx Designer. He built workflows that could take data from SAP, match the data against other data sets, and output it as a spreadsheet for more hands-on analysis. Mantero used Alteryx Designer to create workflows for two KPIs: one that tracks planned and released orders for components and materials, and another which monitors when those items are withdrawn for use in a project. The use of Alteryx Designer was not limited to the planning department. Colleagues across supply chain, administration, and finance also started working with Alteryx to accelerate analytics and improve the quality of insights they were providing to leadership.
Operational Impact
Quantitative Benefit
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
Related Case Studies.
Case Study
Energy Saving & Power Monitoring System
Recently a university in Taiwan was experiencing dramatic power usage increases due to its growing number of campus buildings and students. Aiming to analyze their power consumption and increase their power efficiency across 52 buildings, the university wanted to build a power management system utilizing web-based hardware and software. With these goals in mind, they contacted Advantech to help them develop their system and provide them with the means to save energy in the years to come.
Case Study
System 800xA at Indian Cement Plants
Chettinad Cement recognized that further efficiencies could be achieved in its cement manufacturing process. It looked to investing in comprehensive operational and control technologies to manage and derive productivity and energy efficiency gains from the assets on Line 2, their second plant in India.
Case Study
Intelligent Building Automation System and Energy Saving Solution
One of the most difficult problems facing the world is conserving energy in buildings. However, it is not easy to have a cost-effective solution to reduce energy usage in a building. One solution for saving energy is to implement an intelligent building automation system (BAS) which can be controlled according to its schedule. In Indonesia a large university with a five floor building and 22 classrooms wanted to save the amount of energy being used.
Case Study
Powering Smart Home Automation solutions with IoT for Energy conservation
Many industry leaders that offer Smart Energy Management products & solutions face challenges including:How to build a scalable platform that can automatically scale-up to on-board ‘n’ number of Smart home devicesData security, solution availability, and reliability are the other critical factors to deal withHow to create a robust common IoT platform that handles any kind of smart devicesHow to enable data management capabilities that would help in intelligent decision-making
Case Study
Commercial Building Automation Boosts Energy Efficiency
One of the challenges to building automation is the multitude of non-interoperable communications protocols that have evolved over the years. Buildings have several islands of automation. Bridging the islands of different automation without losing the considerable investment in each specialized control network is the main focus in this solution.