ABB 提高生产力并降低运营成本
技术
- 平台即服务 (PaaS) - 数据管理平台
- 平台即服务 (PaaS) - 设备管理平台
适用行业
- 设备与机械
适用功能
- 现场服务
用例
- 机器状态监测
- 预测性维护
客户
ABB
关于客户
ABB 是世界上最大的工程公司之一,也是最大的企业集团之一。 ABB 在约 100 个国家开展业务,截至 2015 年底员工人数约为 135,000 人。
挑战
ABB 依靠控制中心来监控与客户工业机器人的连接,以发现潜在问题。一旦条件发生变化,ABB 工程师就想了解它,以便他们能够采取行动。工程师想要一个解决方案,以便他们可以通过不断分析从设备接收到的信息来预测问题。他们开发了一组预测性 KPI,与客户共享,以帮助他们确定设备是否需要维护。
解决方案
Jasper 平台对 ABB 的最大好处是能够在全球范围内管理和自动化其连接的设备,同时保持公司的高服务可靠性和不断增长的服务需求。在 Jasper 之前,ABB 会在客户打电话给他们时做出反应,而且很难获得信息来准确了解设备级别发生的事情。借助 Jasper 自动化,ABB 可以在其远程设备上实时监控数据,并且可以在事件发生之前自动做出响应。软件组件 - Jasper 平台 - 控制中心
收集的数据
Device Diagnostic Status, Device Status, Number Of Connected Devices, Per-Unit Maintenance Costs, Response Time
运营影响
Case Study missing?
Start adding your own!
Register with your work email and create a new case study profile for your business.
相关案例.
Case Study
Smart Water Filtration Systems
Before working with Ayla Networks, Ozner was already using cloud connectivity to identify and solve water-filtration system malfunctions as well as to monitor filter cartridges for replacements.But, in June 2015, Ozner executives talked with Ayla about how the company might further improve its water systems with IoT technology. They liked what they heard from Ayla, but the executives needed to be sure that Ayla’s Agile IoT Platform provided the security and reliability Ozner required.
Case Study
IoT enabled Fleet Management with MindSphere
In view of growing competition, Gämmerler had a strong need to remain competitive via process optimization, reliability and gentle handling of printed products, even at highest press speeds. In addition, a digitalization initiative also included developing a key differentiation via data-driven services offers.
Case Study
Predictive Maintenance for Industrial Chillers
For global leaders in the industrial chiller manufacturing, reliability of the entire production process is of the utmost importance. Chillers are refrigeration systems that produce ice water to provide cooling for a process or industrial application. One of those leaders sought a way to respond to asset performance issues, even before they occur. The intelligence to guarantee maximum reliability of cooling devices is embedded (pre-alarming). A pre-alarming phase means that the cooling device still works, but symptoms may appear, telling manufacturers that a failure is likely to occur in the near future. Chillers who are not internet connected at that moment, provide little insight in this pre-alarming phase.
Case Study
Premium Appliance Producer Innovates with Internet of Everything
Sub-Zero faced the largest product launch in the company’s history:It wanted to launch 60 new products as scheduled while simultaneously opening a new “greenfield” production facility, yet still adhering to stringent quality requirements and manage issues from new supply-chain partners. A the same time, it wanted to increase staff productivity time and collaboration while reducing travel and costs.
Case Study
Integration of PLC with IoT for Bosch Rexroth
The application arises from the need to monitor and anticipate the problems of one or more machines managed by a PLC. These problems, often resulting from the accumulation over time of small discrepancies, require, when they occur, ex post technical operations maintenance.
Case Study
Robot Saves Money and Time for US Custom Molding Company
Injection Technology (Itech) is a custom molder for a variety of clients that require precision plastic parts for such products as electric meter covers, dental appliance cases and spools. With 95 employees operating 23 molding machines in a 30,000 square foot plant, Itech wanted to reduce man hours and increase efficiency.